Jump to content

Talk:Peak Rail

Page contents not supported in other languages.
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Jaconway88 (talk | contribs) at 05:20, 8 February 2009. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

WikiProject iconTrains: in UK Start‑class Low‑importance
WikiProject iconThis article is within the scope of WikiProject Trains, an attempt to build a comprehensive and detailed guide to rail transport on Wikipedia. If you would like to participate, you can visit the project page, where you can join the project and/or contribute to the discussion. See also: WikiProject Trains to do list and the Trains Portal.
StartThis article has been rated as Start-class on Wikipedia's content assessment scale.
LowThis article has been rated as Low-importance on the project's importance scale.
Associated projects or task forces:
Taskforce icon
This article is supported by WikiProject UK Railways (assessed as Low-importance).
Note icon
This article lacks references.

Signalling diagram errors

Although I have no personal knowledge of this railway, there seems to be a number of obvious inaccuracies on the signalling diagram included in the article:

  • The semaphore arms of signal CL6 are projecting on the wrong side of the post
  • The L.O.S. is facing the wrong way
  • Signal CL14 is bracketed away from line instead of towards it
  • Signal DD7 is bracketed away from line instead of towards it

Could someone with reliable knowledge of the signalling on this railway please confirm the correct situation. –Signalhead < T > 14:03, 18 January 2009 (UTC)[reply]

I am creating a new track diagram, smae size as the old one, but problems fixed. manadude2 (talk) 21:35, 19 January 2009 (UTC)[reply]
Thanks; that's corrected some of the errors but CL6 and DD7 are still wrong, I reckon. –Signalhead < T > 22:35, 19 January 2009 (UTC)[reply]
After spending about 5 months at the railway, and worked in both signalboxes, I can assure you the signals on this diagram are as accurate as possible to the real thing, but due to space and some problems encountered during production, the diagram may not be 100% accurate, which is something you can expect. If you want to have a bash at creating a diagram that IS 100% accurate, be my guest, but it is impossible to be completely accurate. Please be aware that there is no offencive thoughts in this message. manadude2 (talk) 00:09, 20 January 2009 (UTC)[reply]
I've created my own version of the diagram and included it in the article. –Signalhead < T > 22:05, 20 January 2009 (UTC)[reply]

Proper Grammar

Please use correct grammar. I have noticed commas with no spaces, and name uncapitalised. I have added the {{copyedit}} tag. Thanks manadude2 (talk) 21:09, 19 January 2009 (UTC)[reply]

I would reccomend that the 'future' and 'extensions' sections be merged, and second the grammatical condemnation of the entirety.