Victoria sur le Parc
This article, Victoria sur le Parc, has recently been created via the Articles for creation process. Please check to see if the reviewer has accidentally left this template after accepting the draft and take appropriate action as necessary.
Reviewer tools: Inform author |
This article, Victoria sur le Parc, has recently been created via the Articles for creation process. Please check to see if the reviewer has accidentally left this template after accepting the draft and take appropriate action as necessary.
Reviewer tools: Inform author |
Victoria sur le Parc | |
---|---|
General information | |
Status | Under construction |
Type | Mixed-use |
Architectural style | Modern |
Location | 700 Rue Saint-Jacques Montreal, Quebec H3C 1E9 |
Coordinates | 45°30′00″N 73°33′39″W / 45.50000°N 73.56083°W |
Construction started | 30 April 2019[1] |
Completed | 2023 |
Height | |
Architectural | 200 m (660 ft) |
Technical details | |
Floor count | 58 |
Design and construction | |
Architecture firm | Beique Legault Thuot Architectes; IBI Group Architects |
Developer | Broccolini |
Main contractor | Broccolini |
Other information | |
Number of units | 400[2] |
Website | |
www | |
References | |
[3] |
Victoria sur le Parc is a mixed-use skyscraper under construction in Montreal, Quebec, Canada. It is named for its location just south of Victoria Square in the city's downtown core.
When completed in 2023, Victoria sur le Parc will become the tallest residential building in Montreal, and tied with the then completed 800 Saint-Jacques Street West as the third tallest building in Montreal.[3][4]
Location
Victoria sur le Parc is located at the corner of Boulevard Robert-Bourassa and Rue Saint-Jacques in the northwest corner of the Cité du Multimédia neighbourhood of Montreal. The building is located within 300 metres of Victoria Square, Place Bonaventure, Gare Centrale, and the eastbound entrances to the underground portion of Autoroute 720.
History
In January 2018, a 12,541 square metre (135,000 sq ft) site beside the Tour de la Bourse was purchased by real estate developer Broccolini for $100 million, a large portion of which was subsequently sold to National Bank for the development of their new headquarters. The site was formerly occupied by a few low-rise buildings and a parking lot.[5]
Construction of Victoria sur le Parc began on 30 April 2019 but was temporarily halted in March 2020 due to public health concerns brought on by the COVID-19 pandemic. Construction resumed on May 11 and the building is still expected to be completed by 2023.[6]
Design
Victoria sur le Parc will feature a glass-clad exterior and a prominent diamond-shaped roof that slopes down toward the Saint Lawrence River, similar to the roof of the Crain Communications Building in Chicago. The building structure is composed of two distinct elements: a 9 storey podium featuring 30,658 square metres of mixed commercial and office space, and a 49 storey residential tower featuring 400 housing units of varying sizes.[2][4]
See Also
References
- ^ "Broccolini marks the launch of construction of the tallest residential tower in Montreal". www.newswire.ca. Retrieved 2020-06-26.
- ^ a b "Broccolini builds major projects in Toronto, Montreal, Ottawa". RENX - Real Estate News Exchange. 2020-09-10. Retrieved 2020-09-11.
- ^ a b "Victoria sur le Parc - The Skyscraper Center". www.skyscrapercenter.com. Retrieved 2019-10-11.
- ^ a b "This will be the new second tallest building in Montreal (RENDERINGS) | Urbanized". dailyhive.com. Retrieved 2020-06-26.
- ^ "Broccolini plans Montreal's tallest residential tower". RENX - Real Estate News Exchange. 2018-03-29. Retrieved 2020-06-26.
- ^ "Broccolini shifts to hiring mode ahead of Quebec construction restart". Montreal Gazette. Retrieved 2020-06-26.
External links
Category:Buildings and structures in Quebec Category:Skyscrapers in Montreal
This article, Victoria sur le Parc, has recently been created via the Articles for creation process. Please check to see if the reviewer has accidentally left this template after accepting the draft and take appropriate action as necessary.
Reviewer tools: Inform author |