Jump to content

Dali–Lincang railway

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by 瑞丽江的河水 (talk | contribs) at 20:35, 16 January 2021 (added Category:Transport in Lincang using HotCat). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Dali–Lincang railway
Overview
Native name大临铁路
StatusOperating
Termini
Service
TypeHeavy rail
Operator(s)China Railway Kunming Group
History
Opened30 December 2020 (2020-12-30)
Technical
Line length201.8 km (125 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification50 Hz 25,000 V
Operating speed160 km/h (99 mph)
Chinese name
Traditional Chinese鐵路
Simplified Chinese铁路
Transcriptions
Standard Mandarin
Hanyu PinyinDàlín Tiělù

The Dali–Lincang railway (Chinese: 大临铁路) is a single-track electrified railway in China. The combined passenger and freight line is 201.8 kilometres (125.4 mi) long and has a design speed of 160 kilometres per hour (99 mph).[1]

History

In December 2020, electrification of the railway was completed.[2] It opened on 30 December 2020. Initial service provision was three trains in each direction between Dali and Lincang, and one train per day in each direction between Kunming and Lincang.[3] Services will be increased further from 20 January 2021.[4]

Passenger stations

References

  1. ^ 大理巍山临沧铁路将于年内开工建设_国内铁路_中华铁道网. www.chnrailway.com. Retrieved 2020-12-18.
  2. ^ 大临铁路全线接触网顺利贯通. gaotie.cn. 17 December 2020. Retrieved 18 December 2020.{{cite web}}: CS1 maint: url-status (link)
  3. ^ 大理至临沧铁路30日开通运营 - 州市 - 云南日报网. www.yndaily.com. Retrieved 2020-12-30.
  4. ^ 云南:1月20日起昆明至临沧动车增开至4对 出行更便捷_【高铁网】. news.gaotie.cn. Retrieved 2021-01-12.