Clifton Corridor
Clifton Corridor | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
The Clifton Corridor is a proposed public transportation corridor in and near Atlanta, Georgia. It stretches from Lindbergh Center eastwards, following the existing CSX rail corridor to Emory University, with possible continuation along the northern edge of Decatur via Suburban Plaza on N. Decatur Rd. and on to the Avondale MARTA station. MARTA selected light rail as the preferred mode for the corridor in 2012. Emory strongly supports rapid transit in the corridor.[1]
History
A local rail service along the Clifton Corridor was envisioned as early as 1961, when the line was included on maps for a potential regional transportation system.[2]
In March 2012, after considering bus, light rail and heavy rail rapid-transit options,[3] MARTA recommended a light rail option.[4] In Summer 2012, there was a referendum on a 1-cent sales tax (SPLOST) to fund traffic and road improvements. If approved, the tax would have provided $700 million to fund rapid transit along the Clifton Corridor.[5] The measure was defeated by voters.
By the summer of 2018, MARTA updated the Clifton Corridor fact sheet with Alternative 6 shown as the selected routing split into two phases. Construction of first phase from Lindburgh to North Decatur / Clairmont is expected to begin in 2022 and be complete and operational by 2026. The initial segment is estimated to cost between $900 million to $1.3 billion, with build-out of the full line running $1.8–2.1 billion.[6]
Stations
MARTA proposes stations at:[6]
- Lindbergh Center
- Cheshire Bridge Road (near Faulkner Road and the Morningside Nature Preserve
- Sage Hill / Briarcliff (near the intersection of Briarcliff Road, Johnson Road, and Zonolite Road)
- CDC/Emory Conference Center
- Emory-Rollins
- Andrews Circle
- North Decatur / Clairmont
- Suburban Plaza
- DeKalb Medical Center
- Irwin Way
- Your Dekalb Farmers Market
- Avondale MARTA station
External links
References
- ^ "Clifton Corridor transit project at crucial juncture", Emory University, July 19, 2011
- ^ "Proposed MARTA light rail line would ease Clifton Corridor traffic". Emory Report. September 11, 2018. Retrieved January 29, 2021.
- ^ "MARTA Clifton Corridor". Archived from the original on January 24, 2012. Retrieved January 20, 2012.
- ^ "Light Rail Recommended in Emory, CDC Area", Patch, March 22, 2012
- ^ ""Transportation Investment Act - Final Report ‐ Approved Investment List - Atlanta Roundtable Region" - Atlanta Regional Commission, October 15, 2011" (PDF). Archived from the original (PDF) on October 18, 2011. Retrieved October 23, 2011.
- ^ a b "MARTA". MARTA.[non-primary source needed]