Jump to content

Chongqing Suburban Railway

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by AquariRajan282011 (talk | contribs) at 08:33, 14 May 2021 (Lines under construction). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Chongqing Suburban Railway
Overview
Native name重庆市郊铁路
LocaleChongqing, China
Transit typeCommuter rail, rapid transit
Websitehttp://www.cqrailway.com
Operation
Operator(s)Chongqing Railway Group Co, Ltd
Technical
Track gauge1,435 mm (4 ft 8+12 in)
Electrification25 kV AC overhead line
Top speed100 km/h (62 mph) – 200 km/h (120 mph)
Chongqing Suburban Railway
Simplified Chinese重庆市郊铁路
Traditional Chinese重慶市郊鐵路
Transcriptions
Standard Mandarin
Hanyu PinyinChóngqìng Shìjiāo Tiělù
other Mandarin
Sichuanese PinyinCong2qin4 Si4jiao1 Tie2nu4

Chongqing Suburban Railway is a commuter rail transit system in construction in Chongqing, China. According to the Comprehensive Transport Plan of Chongqing Main City Zone, the system will have a total of 14 lines.

Lines under construction

Planned Opening Project Terminus Top speed Type Length (km) New stations Start of construction Status Notes
2021 Add→{{rail-interchange}} [Note 1] Phase I Tiaodeng Shengquansi 120 km/h (75 mph) Double-track 26.7 5 2014 In full construction [1]
TBA Add→{{rail-interchange}} Yuhe line Moxinpo Weituo 160 km/h (99 mph) Double-track 49.5 5 2015 In full construction
2022 Add→{{rail-interchange}} Heyong line Huangniba Yongchuan South 160 km/h (99 mph) Single-track 95.0 8 2017 Under preparation
2023 Add→{{rail-interchange}} Bitong line Bishan Tongliang[2] 160 km/h (99 mph) Double-track 37.5[2] 9[2] 2019 In full construction [2]
2025 Add→{{rail-interchange}} [Note 1] Phase II Shengquansi Dingshan 120 km/h (75 mph) Double-track 4.61 2 2020 Under preparation [1]

Lines planned

Lines Terminals Stations Length (km)
Add→{{rail-interchange}} Moxinpo Weituo 8 610
Add→{{rail-interchange}} Bishan Tongnan 11
Add→{{rail-interchange}} Baishiyi Dazu 8
Add→{{rail-interchange}} Jiulongyuan Rongchang 8
Add→{{rail-interchange}}[Note 1] Tiaodeng Yudong 17
Add→{{rail-interchange}} Chongqing East Wansheng 5
Add→{{rail-interchange}} Chongqing East Mount Jinfo 5
Add→{{rail-interchange}} Fusheng Fulin North 7
Add→{{rail-interchange}} Guojiatuo Changshou North 4
Add→{{rail-interchange}} Huangniba Yongchuan South 13 Un­known
Add→{{rail-interchange}} Tiaodeng Guojiatuo 6 154
Add→{{rail-interchange}} Baishiyi Chongqing East 4
Add→{{rail-interchange}} Moxinpo Fusheng 3
Total 99 Un­known

See also

References

  1. ^ a b "重点项目". 重庆铁路(集团)有限公司 (in Chinese (China)). Retrieved April 2, 2017.
  2. ^ a b c d "璧铜线开工 璧铜线设站9座 新型快线车从铜梁一小时飙拢解放碑". November 29, 2019.

Notes

  1. ^ a b c Through service with Line 5 (Chongqing Rail Transit)