Project 23131 replenishment oiler

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Citation bot (talk | contribs) at 11:22, 25 March 2022 (Add: title. Changed bare reference to CS1/2. | Use this bot. Report bugs. | Suggested by BrownHairedGirl | Linked from User:BrownHairedGirl/Articles_with_new_bare_URL_refs | #UCB_webform_linked 652/1891). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Class overview
NameProject 23131
BuildersZaliv shipyard
Operators Russian Navy
Built2014–present
Building2
General characteristics
TypeReplenishment oiler
Tonnage12,000 DWT
Length145 m (476 ft)
Beam24 m (79 ft)
Draught7 m (23 ft)
Propulsion2 × diesels, 2 × fixed pitch propellers, 2 × bow thrusters
Speed16 kn (30 km/h; 18 mph)
Range8,000 nmi (15,000 km; 9,200 mi)
Endurance60 days
Complement24

Project 23131 is a series of replenishment oilers, developed by the Spetssudoproect JSC and being constructed by the Zaliv shipyard for the Russian Navy since December 2014. It is a heavier version and further development of Project 23130 replenishment oiler Academic Pashin.

History

The first two Project 23131 ships, serial numbers "301" and "302", were laid down during a keel laying ceremony at the Zaliv shipyard, Kerch on 26 December 2014.[1] They were originally planned to enter service in 2018.[2] In November 2018, Zaliv shipyard reported that formation of the ships' hulls and superstructures was complete and that work was currently underway to prepare the two hulls for electrical installations.[3] As of 2022, neither ship is complete.

Ships

Name Builder Laid down Launched Commissioned Status
Zaliv Shipyard 26 December 2014[1] Under construction
Zaliv Shipyard 26 December 2014[1] Under construction

See also

References

  1. ^ a b c "В Керчи заложены два танкера для ВМФ России" [Two tankers for the Russian Navy laid down in Kerch]. bmpd.livejournal.com (in Russian). 27 December 2014. Retrieved 31 March 2019.
  2. ^ "На заводе "Залив" отчитались: танкеры для ВМФ строят, но в срок не сдадут".
  3. ^ "Завод "Залив" завершил формирование корпусов двух морских танкеров" [Zaliv plant completed the hulls of two sea tankers]. sudostroenie.info (in Russian). 7 November 2018. Retrieved 31 March 2019.

Project 23131 at RussianShips