Jump to content

Chatara Hydropower Station

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Doktor Züm (talk | contribs) at 07:50, 20 September 2022 (replaing->replacing - Correct typos in one click). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Chatara Hydropower Station
Official nameChatara Hydropower Station
CountryNepal
LocationSunsari District
PurposePower
StatusOperational
Owner(s)Nepal Electricity Authority
Dam and spillways
Type of damGravity
Commission date2074-12-26 BS
TypeRun-of-the-river
Installed capacity3.2 MW
Annual generationKaplan Type

Chatara Hydropower Station(नेपालीः चतरा जलविद्युत आयोजना) is a canal drop type power station having an installed capacity of 3.2 MW.[1] The power station was commissioned in the year 1996 AD and was handed over to Nepal Electricity Authority by Sunsari Morang Irrigation Project on 29 March 1999. This power station is supplying electricity to local area through Chatara feeder.[2]

The plant was repaired in 2073BS by replacing the turbines.[3]

See also

References

  1. ^ "३.२ मेगावाटको जलविद्युत तीन वर्षदेखि बन्द". Radio Annapurna Nepal. Retrieved 2020-12-09.
  2. ^ "Company | Rudra International". Retrieved 2020-12-09.
  3. ^ "सुनसरीको चतरा स्थित चतरा जलविद्युत केन्द्र संचालनमा". News24 : Premium News Channel. Retrieved 2020-12-09.