Construction started | 2007 |
Completed | 2012 |
Inaugurated | 11 October 2012 |
Cost | ₹4 billion (US$48 million) |
Owner | Karnataka Government |
Height | 150 feet (46 m) |
Technical details | |
Floor count | 4 + 1 basement |
Floor area | 145,730 square metres (1,568,600 sq ft) |
Design and construction | |
Main contractor | B.G. Shirke Construction Technology Pvt. Ltd. |
Other information | |
Seating capacity | 300 Members |
The Suvarna Vidhana Soudha (lit. 'Golden Legislative House') is the legislature building of the State of Karnataka in Belagavi in the Belagavi district of Karnataka. It was inaugurated on 11 October 2012 by President Pranab Mukherjee.[1]
The building
The Suvarna Vidhana Soudha has been so named to commemorate the Golden Jubilee of Karnataka's formation day.[2] The building is a four floored structure with a total built-up area of 60,398 sq.m. and consists of an Assembly hall that seats 300, a Council hall for 100 members, a 450-seat Central Hall, 38 ministerial chambers and 14 meeting halls. It also has conference halls, a banquet hall, secretariats for both the houses of legislature, meeting halls and office accommodations.[3][1] The entire complex is located on 127 acres of land that was acquired from farmers in the area. The Ashoka Chakra atop the main dome of the building, measuring 3.68 metres by 2.11 metres and weighing 6.50 tonnes was created by the V T N Creative Art Studio in Bangalore.[4] The facade of the building has the motto 'Work is Worship' (kayakave kailasa) given by 12th century poet and social reformer Basavanna inscribed on it.[5]
History of construction
The Suvarna Vidhana Soudha was constructed as a part of Karnataka's reiteration of its control over Belagavi in its inter state rivalry with Maharashtra for control of the district. While the proposal to build a legislature building in Belagavi to counter Maharashtra's claim to the area had been mooted several years ago, it was after HD Kumaraswamy became Chief Minister that the project gained momentum. While it was originally to have come up at Tilakwadi, it was subsequently relocated to its present location at the Halga-Bastwad area of Belagavi, 10 km from the city and just off the Bangalore-Mumbai highway, which is a part of the Golden Quadrilateral project. The bhoomi puja for the original building was performed by the then Chief Minister, Kumaraswamy in 2007 while his successor, Yeddyurappa performed it for the construction of the building at its new venue in 2009.[2][1]
Work began on the building in August 2009 and it was to have been completed in 18 months within an original budget of ₹ 2.30 billion. The Pune based B.G. Shirke Construction Technology Pvt. Ltd. were given the contract to construct the building.[6] There were repeated extensions of the deadline on account of tardy progress in construction. The contract for interior design and services consultancy was awarded to Gajbar & Associates headed by Ar. Vijay Gajbar from Belagavi and Kolhapur. They were entrusted with the interior design of all the halls and audiotorioums inside the building. They also provided design consultancy for outer landscape and MEP design. [7][8] By August 2012, the cost of the building alone had reached ₹391 crore with estimates suggesting a final bill of nearly ₹5 billion (roughly US$100 million) on its completion.[2] The inauguration ceremony itself has been billed at ₹150 million.[9]
Criticism
The building of the Suvarna Soudha has been criticised as an extravagance as the building will only be used once a year to hold a session of the Karnataka Legislative Assembly.[2] The Karnataka Government however has suggested that the building will also host legislative committee and regional meetings of the State government and conferences and meetings with foreign delegations when the legislative session is not being held there.[10]
References
- ^ a b c "A new chapter begins today". The Hindu. 11 October 2012.
- ^ a b c d "Border Posturing". Open Magazine.
- ^ "Suvarna Vidhana Soudha is not fully ready". Deccan Herald. 1 June 2012.
- ^ "Ashok Chakra for Suvarna Soudha". Indian Express. 26 August 2012.
- ^ "President to inaugurate Suvarna Vidhana Soudha". Business Standard. 11 October 2012.
- ^ "Work on Suvarna Vidhana Soudha begins in Belgaum". The Hindu. 14 August 2009. Archived from the original on 18 August 2009.
- ^ "Suvarna Vidhana Soudha to be ready by January 2011". The Hindu. 12 December 2009. Archived from the original on 17 December 2009.
- ^ "Suvarna Soudha looks at monsoon session deadline". The Times of India. 30 May 2012. Archived from the original on 3 January 2013.
- ^ "Inauguration of Suvarna Vidhan Soudha to cost 15 crores". Retrieved 8 October 2012.
- ^ "Suvarna Soudha to be opened in Sept". Deccan Herald. 6 August 2012.