Rantarata

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by I dream of horses (talk | contribs) at 18:44, 6 June 2019 (Clean up). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Rantarata
Overview
Termini
Stations28
History
Opened1902
Technical
Line length195.8 km (121.66 mi)
Number of tracksQuad (Helsinki–Leppävaara)
Double (Leppävaara–Kirkkonummi)
Single (Kirkkonummi–Turku)
Track gauge1,524 mm (5 ft)
Electrification25 kV @ 50 Hz
Operating speed120 to 200 km/h (75 to 124 mph)
Route map
Template:Infobox rdt

Rantarata (the Coastal Railway, Swedish: Kustbanan), is a railway running between the Helsinki Central railway station and the Turku railway station in Finland. Its first segment, linking Turku to Karis, was commissioned in 1895, and work began the following year. The Turku–Karis track was opened for temporary traffic on 1 April 1899 and for permanent use on 1 November 1899. The second part of the Rantarata, linking Karis to Helsinki, was approved in 1897 and opened for traffic in 1902–1903. "Rantarata" is Finnish for "coast track".

The track was done to serve primarily in commuter traffic and was therefore laid out with many curves and as few tunnels and expensive earthworks as possible. This resulted in a series of corrections and straightening of curves, a work with began in the 1910s and continued all the way to the 1990s.

As a part of the original plan, all of the stations along the Rantarata featured wooden station houses designed by the architect Bruno Granholm. Over the years many of these wood station building had been dismantled to make way for newer structures, such as Leppävaara railway station in 1999. Some of the old buildings still remain, Kauniainen railway station being the most significant example.

The track between Helsinki and Kirkkonummi was upgraded with 25 kV AC railway electrification during the 1960s, being the first government-owned electrified railway line in Finland. Together with other improvements and maintenance, the Kirkkonummi–Karis track received its overhead lines in 1992. Coinciding with the purchase of VR Group's first VR Class Sm3 "Pendolino" high-speed trains, the remaining track between Karis and Turku Harbour was electrified in 1995, completing the route.

The passenger service to Uusikaupunki was cancelled in the early 1990s, while freight traffic continues through the port of Uusikaupunki. Work to electrify the line to Uusikaupunki scheduled to begin in 2019, leading to the possibility of passenger service being reinstated.[1]

References

External links

Media related to Helsinki–Turku railway at Wikimedia Commons