Jump to content

Blaiken wind farm

Coordinates: 65°17′05″N 17°10′18″E / 65.2846°N 17.1716°E / 65.2846; 17.1716
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by InternetArchiveBot (talk | contribs) at 21:30, 10 June 2019 (Rescuing 1 sources and tagging 0 as dead. #IABot (v2.0beta15)). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Blaiken wind farm
Map
CountrySweden
LocationStoruman, Vasterbotten
Coordinates65°17′05″N 17°10′18″E / 65.2846°N 17.1716°E / 65.2846; 17.1716
StatusIn production
Construction began2011
Commission date2015
Construction cost€3.8 billion SEK
OwnersSkellefteå Kraft
Fortum
Power generation
Units operational90
Nameplate capacity225 MW
Annual net output
  • 700 GWh

Between 2011 and 2015, BlaikenVind AB, a joint venture of Skellefteå Kraft and Fortum are building one of Europe's largest wind farms in northern Sweden. When finished, the park will consist of 90 wind power plants and have a total capacity of 225 MW. Blaiken wind farm, has been chosen as a demonstration plant by the EU's NER300 programme, one of the world's largest funding programmes for climate-neutral energy. The project meets the challenge of developing good solutions for efficient wind power production in a cold and icy climate.

[1][2]

References

  1. ^ Backwell, Ben (2010-08-31). "Fortum takes 40% stake in giant Swedish wind project". ReCharge. NHST Media Group. (subscription required). Retrieved 2010-08-31.
  2. ^ "Fortum to partner in one of Europe's biggest onshore wind farm projects with 40% holding" (Press release). Fortum. 2010-08-31. Retrieved 2010-08-31.[permanent dead link]