Jump to content

Zečeve Drage Viaduct

Coordinates: 45°22′35″N 15°07′38″E / 45.376478°N 15.127144°E / 45.376478; 15.127144
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Monkbot (talk | contribs) at 02:03, 19 September 2019 (Traffic volume: Task 16: replaced (1×) / removed (0×) deprecated |dead-url= and |deadurl= with |url-status=;). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Zečeve Drage Viaduct
Coordinates45°22′35″N 15°07′38″E / 45.376478°N 15.127144°E / 45.376478; 15.127144
CarriesA6 motorway
LocaleGorski Kotar, Croatia
Official nameViadukt Zečeve Drage
Maintained byAutocesta Rijeka–Zagreb
Characteristics
DesignBox girder bridge
Total length939.23 m (3,081 ft 6 in)
Width2 × 12.9 m (42 ft 4 in)
Longest span50 m (164 ft 1 in)
Clearance above53.04 m (174 ft 0 in)
History
Opened2004
Statistics
Tollcharged as a part of A6 motorway toll
Location
Map

The Zečeve Drage Viaduct is located between the Bosiljevo 2 and Vrbovsko interchanges of the A6 motorway in Gorski Kotar, Croatia, just to the west of the Veliki Gložac Tunnel. It is 939.2 metres (3,081 ft) long. The viaduct consists of two parallel structures: the first one was completed in 2004, and the second one in 2008. The viaduct is tolled within the A6 motorway ticket system and there are no separate toll plazas associated with its use.[1] The viaduct was completed by Viadukt.[2][3][4]

Structure description

At this location the motorway route follows a horizontal curve with a radius of 2,505.1 metres (8,219 ft). The deck of the viaduct follows a 26,500-metre (86,900 ft) radius concave vertical curve, and the longitudinal grade of the road carried by the viaduct ranges from 4.38% to 0.78%. The viaduct is a box girder structure supporting the deck across nineteen spans: two of 40 m (130 ft), sixteen of 50 m (160 ft) and one of 40 m (130 ft). The viaduct piers range from 18.72 m (61.4 ft) to 53.04 m (174.0 ft) in height. The superstructure of the viaduct comprises a box cross section made from pre-stressed reinforced concrete, put in place by incremental launching due to the considerable height of the structure. The launching was carried out downhill, because of the substantial grade of the superstructure, with two VBT 19×140 cable stays as a braking mechanism for the 20,000 tonnes (20,000 long tons; 22,000 short tons) box girder. The cross-sections of the box girder and the piers are virtually identical to those of Bajer Bridge.[1][2][3]

Traffic volume

Traffic volumes are regularly measured and reported by Autocesta Rijeka–Zagreb, the operator of the viaduct and A6 motorway where the structure is located, and published by Hrvatske ceste. Substantial variations between annual (AADT) and summer (ASDT) traffic volumes are attributed to the fact that the bridge carries a large amount of tourist traffic to the Adriatic resorts. The traffic count is performed using analysis of motorway toll ticket sales.[5]

Zečeve Drage Viaduct traffic volume
Road Counting site AADT ASDT Notes
A6 3022 Bosiljevo 2 west 11,448 19,401 Between Bosiljevo 2 and Vrbovsko interchanges.

See also

References

  1. ^ a b Croatian Motorways (PDF). Hrvatske autoceste. 2007. pp. 350–351. ISBN 978-953-7491-09-3. Retrieved September 11, 2010.
  2. ^ a b "Viaduct "Zečeve Drage" Rijeka-Zagreb highway". Viadukt. Retrieved October 11, 2010.
  3. ^ a b "Vijadukt Zečeve drage na autocesti Karlovac – Rijeka" [Zečeve Drage Viaduct on Karlovac - Rijeka motorway] (in Croatian). Gradimo. January 1, 2007. Retrieved October 11, 2010.
  4. ^ "Autocesta Rijeka-Zagreb" [Rijeka-Zagreb motorway] (PDF). HUKA bulletin (in Croatian) (7). HUKA: 2. March 2006. Retrieved October 11, 2010.
  5. ^ "Traffic counting on the roadways of Croatia in 2009 - digest" (PDF). Hrvatske Ceste. May 1, 2010. Archived from the original (PDF) on July 21, 2011.