Jump to content

KD Singh Babu Stadium metro station

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Monkbot (talk | contribs) at 12:04, 2 October 2019 (top: Task 16: replaced (1×) / removed (0×) deprecated |dead-url= and |deadurl= with |url-status=;). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

KD Singh Babu Stadium
Lucknow Metro station
General information
Owned byLucknow Metro
Operated byLucknow Metro Rail Corporation
Line(s)  Red Line
PlatformsSide platform Platform-1 → Munshi Pulia
Platform-2 → Chaudhary Charan Singh International Airport
Tracks2
Construction
Structure typeElevated, Double Track
Platform levels2
History
Opened8 March 2019; 5 years ago (2019-03-08)
ElectrifiedSingle phase 25 kV, 50 Hz AC through overhead catenary
Services
Preceding station   Lucknow Metro   Following station
Template:Lucknow Metro lines

KD Singh Babu Stadium is a Lucknow Metro station in Lucknow.[1][2][3][4]

Route plan/map

References

  1. ^ "Lucknow Metro gets a blueprint from Delhi". The Indian Express. Retrieved 15 October 2013.
  2. ^ "Lucknow Metro Map". mapsofindia.com. Retrieved 15 October 2013.
  3. ^ "UP Approves Detailed Project Report of Lucknow Metro". news.outlookindia.com/. Archived from the original on 15 October 2013. Retrieved 15 October 2013.
  4. ^ "Proposed Lucknow Metro Stations on North-South and East-West Corridors". mtariqkhan-hindustantimes.blogspot.in/. Retrieved 15 October 2013.