Jump to content

Grozny–Tuapse oil pipeline

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Monkbot (talk | contribs) at 20:37, 2 January 2020 (References: Task 15: language icon template(s) replaced (4×);). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

The Grozny-Tuapse oil pipeline is a 618 kilometres (384 mi) long pipeline connecting oil fields near Grozny, Russia, with sea port Tuapse. The pipeline was launched in 1928, designed by Vladimir Shukhov. The annual throughput of the pipeline along with its 11 pumping stations was 1.5 million tons. It used 10 inches (250 mm) pipes, both welded and weldless. In 1938, oil extraction in Krasnodar territory near Maykop began. The main pipeline was used as a products pipeline, while its end part transported oil from the Krasnodar fields to Tuapse.

References

(in English)

(in German)

  • Rainer Graefe, Jos Tomlow: “Vladimir G. Suchov 1853-1939. Die Kunst der sparsamen Konstruktion.”, 192 S., Deutsche Verlags-Anstalt, Stuttgart, 1990, ISBN 3-421-02984-9.

(in Italian)

(in Russian)

  • "В.Г.Шухов - выдающийся инженер и ученый", Труды Объединенной научной сессии Академии наук СССР, посвященной научному и инженерному творчеству почетного академика В.Г.Шухова. М.: Наука, 1984, 96 с.
  • Шухова Е. М.: «Владимир Григорьевич Шухов. Первый инженер России.», 368 стр., Изд. МГТУ, Москва, 2003, ISBN 5-7038-2295-5.