Jump to content

M8 (Istanbul Metro)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Dpm853 (talk | contribs) at 10:59, 28 March 2020. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

M8 Bostancı–Dudullu
Overview
StatusUnder construction
OwnerIstanbul Metropolitan Municipality
Line numberM8
LocaleIstanbul, Turkey
Termini
  • Bostancı
  • Depo
Stations13
Service
TypeRapid transit
SystemIstanbul Metro
Services1
Operator(s)Metro Istanbul A.Ş.
Depot(s)Dudullu
History
Openedby 2021; 3 years ago (2021)
Technical
Line length14.2[1] km (8.8 mi)
Number of tracks2
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification1,500 V DC Overhead line

Line M8, officially referred to as the M8 Bostancı-Dudullu line, is a rapid transit line of the Istanbul Metro system, currently under construction in the Asian part of Istanbul, Turkey. The line will be 14.2-kilometre (8.8 mi) long with 13 stations, and is expected to go into service in 2021.[2]

Stations

References

  1. ^ "İBB: İki yeni metro hattı geliyor". Haberturk (in Turkish). August 12, 2015. Retrieved 2016-03-23.
  2. ^ "Metro çalışması sürüyor, trafik büyüyor" (in Turkish). Gazete Kadiköy. 2016-09-29. Retrieved 2017-01-12.