Jump to content

Ranjiaba station

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Dpm853 (talk | contribs) at 14:23, 26 June 2020. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Ranjiaba

冉家坝
Loop Line platform (Anti-Clockwise Loop)
General information
LocationChongqing
China
Operated byChongqing Rail Transit Corp., Ltd
Line(s)Urban rail transit in China Add→{{rail-interchange}} Add→{{rail-interchange}} Add→{{rail-interchange}}
Platforms6 (2 island platforms and 2 side platforms)
ConnectionsBus interchange
Construction
Structure typeBelow ground
AccessibleYes
Other information
Station code0/115/086/15
History
Opened
  • January 20th 2013(Line 6)
  • December 28th 2017(Line 5 services added)
  • December 28th 2018(Loop Line expansion)
Services
Preceding station   Chongqing Rail Transit   Following station
Template:CRT lines
Template:CRT lines
Template:CRT lines

Ranjiaba is a station on Line 5, Line 6, and the Loop Line of Chongqing Rail Transit in Chongqing Municipality, China.[1][2] It is located in Yubei District and serves its surrounding area, including nearby office towers, residential blocks and a mall.

It opened on January 20th, 2013 with Line 6.

Line 5 services were later added on December 28th, 2017. The station expanded exactly 1 year later with the opening of the Loop Line section of the station on 28th of December 2018.

Exit and transfer directories at a Loop Line platform

Station Structure

Loop Line Platforms

Platform Layout

There are 2 side platforms for Loop Line trains.

Side Platform Doors open on the right
To Add→{{rail-interchange}} Chongqing Library 0/11

Urban rail transit in China

Anti-Clockwise loop
Clockwise loop Urban rail transit in China

0/11

To Add→{{rail-interchange}} Erlang
Side Platform Doors open on the right

Line 5 & Line 6 Platforms

Platform Layout

A total of 2 island platforms are used for Line 5 and Line 6 trains travelling in both directions.

These 2 platforms were designed with cross-platform interchange in mind and were built during the construction of Line 6. Spaces on the opposite end of the platforms were reserved for Line 5 at the time and came into use when the metro line became operational in 2017.

Island Platform on B2

To Add→{{rail-interchange}} Beibei Urban rail transit in China

6/15

Doors open on the left

Doors open on the right

To Add→{{rail-interchange}} The EXPO Garden Center 5/08

Urban rail transit in China


Island Platform on B3

Urban rail transit in China

6/15

To Add→{{rail-interchange}} Chayuan
Doors open on the right

Doors open on the left

5/08

Urban rail transit in China

To Add→{{rail-interchange}} Dashiba
Transfer directories for cross-platform interchange and opposite direction trains of the Line 5/Line 6 island platform on B2
File:Ranjiaba Station Line 5.jpg
The B2 island platform with its Line 5 (in blue) and Line 6(in pink) sides

References