Jinyu Hutong station
Appearance
General information | |
---|---|
Location | Wangfujing Street / Jinyu Hutong / Donghuamen Street, Dongcheng District, Beijing China |
Coordinates | 39°54′51″N 116°24′18″E / 39.914162°N 116.404865°E |
Operated by | Beijing Mass Transit Railway Operation Corporation Limited |
Line(s) | Line 8 |
Platforms | Island platform |
Construction | |
Structure type | Underground |
Accessible | Yes |
History | |
Opened | 2021 (planned) |
Jinyu Hutong station[1] (Chinese: 金鱼胡同站; pinyin: Jīnyú Hútòng zhàn) is a station under construction on Line 8 of the Beijing Subway.
History
Construction started in 2013. The station was originally called Wangfujing North station. The station is expected to open in 2021.[2]
Station Layout
This station will have an Island platform. There will be 4 exits, all connected to malls. Only the southeast exit will be connected to the street.[3]
G | Entrances and Exits | Exits A-D |
B1 | Concourse | Faregates, Station Agent |
B2 | Northbound | ← Line 8 towards Zhuxinzhuang (National Art Museum) |
Southbound | Line 8 towards Yinghai (Wangfujing) → |
References
- ^ "地名公告详情". 2018-07-17. Retrieved 2020-02-24.
- ^ "北京地铁8号线珠市口至瀛海站年底开通 20日起空载试运行". 2018-09-07. Retrieved 2020-02-04.
8号线未开通的前门站、王府井站和金鱼胡同站等3站明年2月开始盾构施工,全线正式通车时间将在2021年底
- ^ "8号线王府井站直连商场". 2018-06-09. Archived from the original on 2018-06-15.