Choa Chu Kang West MRT station

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Epicgenius (talk | contribs) at 23:28, 2 November 2020 (remove definite article before proper noun "Contract"). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

 JS2 
Choa Chu Kang West
蔡厝港西
சுவா சூ காங் வெஸ்ட்
Mass Rapid Transit (MRT) station
General information
Owned byLand Transport Authority
Line(s)
PlatformsIsland
Tracks2
Construction
Structure typeElevated
Platform levels1
Bicycle facilitiesYes
AccessibleYes
History
Opening2026; 2 years' time (2026)
ElectrifiedYes
Services
Preceding station   Mass Rapid Transit   Following station
One-way operation
Template:SMRT lines
S1 North aft Tengah
Future Service
One-way operation
Template:SMRT lines
S1 South bef Bahar
Future Service
Location
Singapore MRT/LRT system map
Singapore MRT/LRT system map
Choa Chu Kang West
Choa Chu Kang West station in Singapore

Choa Chu Kang West MRT station is a proposed Mass Rapid Transit (MRT) station on the Jurong Region Line in Choa Chu Kang, Singapore. There will be two station names in the JRL naming exercise - Brickland and Choa Chu Kang West.[1][2][3]

History

On 9 May 2018, LTA announced that Choa Chu Kang West station would be part of the proposed Jurong Region line (JRL). The station will be constructed as part of Phase 1, JRL (West), consisting of 10 stations between Choa Chu Kang, Boon Lay and Tawas, and is expected to be completed in 2026.[4]

Contract J102 for the design and construction of Choa Chu Kang West Station and associated viaducts was awarded to Shanghai Tunnel Engineering Co. (Singapore) Pte Ltd at a sum of S$465.2 million. Construction will start in 2020, with completion in 2026.[5] Contract J102 also includes the design and construction of Choa Chu Kang station and Tengah station, and associated viaducts and A&A works to the existing Choa Chu Kang Station complex.[6]

Location

The station will be straddled over the existing Choa Chu Kang Avenue 3, just east of the junction with Choa Chu Kang Avenue 1. It is located within the Choa Chu Kang planning area between the Keat Hong and Peng Siang Subzones,[7] nested within an existing housing estate, near to Sunshine Place.

Access to the station will be via 2 exits, 1 of each side of Choa Chu Kang Avenue 3.[8]

References

  1. ^ "Jurong Region Line to serve NTU, Tengah estate, Jurong Industrial Estate - CNA". 2019-09-21. Archived from the original on 2019-09-21. Retrieved 2019-09-21.
  2. ^ "Residents and students welcome Jurong Region Line but find it confusing". 2019-09-21. Archived from the original on 2019-09-21. Retrieved 2019-09-21.
  3. ^ "Jurong Region Line". 2019-09-21. Archived from the original on 2019-09-21. Retrieved 2019-09-21.
  4. ^ "Joint News Release by the Land Transport Authority (LTA) & SLA - Jurong Region Line: Enhancing Connectivity in the West | Press Room | Land Transport Authority". 2019-09-21. Archived from the original on 2019-09-21. Retrieved 2019-09-21.
  5. ^ "LTA Awards Civil Contracts to Construct Five Stations for the Jurong Region Line | Press Room | Land Transport Authority". 2019-09-21. Archived from the original on 2019-09-21. Retrieved 2019-09-21.
  6. ^ "Tender information | Land Transport Authority". 2019-09-21. Archived from the original on 2019-09-21. Retrieved 2019-09-21.
  7. ^ "Singapore's Jurong West Planning Area". Key Location. Retrieved 2019-09-21.
  8. ^ "Jurong Region Line". 2019-09-21. Archived from the original on 2019-09-21. Retrieved 2019-09-21.