Jump to content

Lijiang–Shangri-La railway

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Mjdestroyerofworlds (talk | contribs) at 00:02, 20 December 2020 (removed Category:2020 in rail transport; added Category:2021 in rail transport using HotCat). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

The Lijiang–Shangri-La railway or Lixiang railway (simplified Chinese: 丽香铁路; traditional Chinese: 麗香鐵路; pinyin: lìxiāng tiělù), is an electrified railroad under construction in Yunnan Province of Southwest China, due to be completed in 2021. The shorthand name of the line is named after its two proposed terminal cities, Lijiang and Shangri-La.

The line is slated to run 139 km (86 mi) from Lijiang, the rail head of the Dali–Lijiang railway, north to Shangri-La in northwestern Yunnan.[1] It will have a design speed of 120 kilometres per hour (75 mph).[2] Despite approval of the project's feasibility plans by the National Development and Reform Commission in May 2009, construction did not begin until July 22 2014.[3] At the time, construction was expected to take six years.[3] It is now expected to open by the end of 2021.[2]

Rail connections

See also

References

  1. ^ "云南:丽江至香格里拉铁路开建". 云南迪庆报 (in Chinese). June 12, 2009. Archived from the original on March 4, 2016.
  2. ^ a b "云南丽江站既有线"接轨"丽香铁路_神州瞭望网_新时代新瞭望". www.zgszlw.com. Retrieved 2020-11-05.
  3. ^ a b Jieru, Ge (July 23, 2014). Salter, Brian (ed.). "Lijiang-Shangrila railway starts construction". China Daily.