Antequera–Granada high-speed rail line

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Jackgill06 (talk | contribs) at 21:38, 18 May 2020. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Antequera–Granada high-speed rail line
Overview
StatusOperational
OwnerAdif
LocaleSpain (Andalucia)
Termini
Service
TypeHigh-speed rail
Operator(s)Renfe Operadora
History
Opened26 June 2019
Technical
Line length125.7 km (78.1 mi)
Number of tracksDouble track
Track gaugeDual gauge
(1,435 mm (4 ft 8+12 in) standard gauge & 1,668 mm (5 ft 5+2132 in)
Electrification25 kV 50 Hz
Operating speedmax 300 km/h

The Antequera–Granada high-speed rail line opened in 2019, linking the Spanish city of Granada to the AVE network via a branch from the existing Madrid–Málaga high-speed rail line at Antequera.

Background

Construction on the line near Antequera in 2013

The 122.8 km line from Antequera to Granada[1] is a part of the under construction Andalusian Transverse Axis high-speed rail line. The three times per day AVE service between Madrid Atocha and Granada covers the distance of 568 km in 3 h 5 min. The daily AVE train between Granada and Barcelona Sants connects the two cities in 6 h 25 min. S-102 and S-112 (Pato, max speed 330 km/h or 205 mph) trains are used for these services and all trains call at Córdoba, offering a journey time of 90 min from Granada.[2] The total cost of building the line was €1.4 billion.[3]

Stations

After branching from the existing Antequera-Santa Ana railway station, the line serves Loja and Granada. In 2019, construction was set to begin on a €16 million underground AVE station in Antequera town centre, making Antequera the only city in Spain outside of Madrid to have two high-speed rail stops.[4]

Services

The line is used by AVE services to Madrid and one daily service to Barcelona. In November 2019, a daily patronage of 2,600 passengers using these services was reported.[5]

References

  1. ^ "Los viajes en AVE a Málaga y Sevilla se estrenan esta semana, con transbordo en Antequera y Córdoba". www.ideal.es. 24 June 2019. Retrieved 27 June 2019.
  2. ^ "Granada joins the AVE network". Railway Gazette International. 25 June 2019. Retrieved 27 June 2019.
  3. ^ "Antequera se sube al AVE". Diario Sur (in Spanish). 24 October 2010. Retrieved 30 August 2019.
  4. ^ "Work on a new AVE station near central Antequera to start soon". Sur in English. February 2019. Retrieved 18 May 2020.
  5. ^ "El AVE de Granada alcanza los 2.600 pasajeros al día con los servicios de Madrid y Barcelona". Granada Hoy (in Spanish). 29 November 2019. Retrieved 6 April 2020.