This is an old revision of this page, as edited by BG19bot (talk | contribs) at 22:28, 29 March 2016 (Technical committees: Remove blank line(s) between list items per WP:LISTGAP to fix an accessibility issue for users of screen readers. Do WP:GENFIXES and cleanup if needed. Discuss this at [[Wikipedia talk:WikiProject Accessibility#LIS...). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

The American Railway Engineering and Maintenance-of-Way Association (AREMA) is a North American railway industry group. It publishes recommended practices for the design, construction and maintenance of railway infrastructure, which are requirements in the United States and Canada.

Overview

AREMA is headquartered in Lanham, Maryland, a suburb of Washington, DC. Its Mission Statement is "The development and advancement of both technical and practical knowledge and recommended practices pertaining to the design, construction and maintenance of railway infrastructure." Charles H. Emely has been the Executive Director and CEO of AREMA since November 1998. Larry L. Etherton is the AREMA President and Chairman of the Board of Governors for 2007-2008.[1]

History

AREMA was created October 1, 1997 by the merger of four industry-related groups:[1]

  • the American Railway Bridge and Building Association
  • the American Railway Engineering Association
  • the Roadmasters and Maintenance of Way Association, and
  • the Communications and Signal Division of the Association of American Railroads

Each of these organizations brings over 100 years of service to the rail industry to AREMA.

American Railway Bridge and Building Association

Formed in 1891 in St. Louis, Missouri as the American International Association of Railway Superintendents of Bridges and Buildings, the Association initially represented 40 railroads. The name was changed in 1907 to the American Railway Bridge and Building Association. The group provided a forum to exchange information and to mind solutions to problems that confront the railway industry.

American Railway Engineering Association

The American Railway Engineering and Maintenance-of-Way Association was formed in Buffalo, New York in 1899 to organize a forum for the development and study of recommended practices for the newly integrated standard gauge North American railway network. Later, the name was shortened to the American Railway Engineering Association (AREA). Five of its technical committees (ties, rail, track, buildings, yards and terminals) have remained intact from 1899 and continue under AREMA functional groups. The first Manual of Recommended Practices was issued in 1905 and its name was changed to the Manual of Railway Engineering in 1970.

Roadmasters and Maintenance of Way Association

The oldest of the groups was organized in 1883 by 61 roadmasters representing 24 railways. The Association provided a means through which maintenance officers would have an opportunity to meet and discuss their mutual problems. Rail joints, switches, frogs and ties were among the subjects studied, leading to the standardization of maintenance practices.

Communications and Signal Division of the Association of American Railroads

In 1885, the Association of Telegraph and Telephone Superintendents was formed by the telegraph superintendents of the major railroads. In 1895, the Railway Signaling Club was organized at a meeting in Chicago, Illinois and created a code of rules governing the operation of interlockings. In 1919, the Signaling Club became the Signal Division of the newly created American Railway Association (ARA) and the Telegraph Superintendents became its Telegraph and Telephone Section. The ARA became the Association of American Railroads (AAR) in 1934; the Signal Division was renamed the Signal Section and the Telegraph and Telephone was renamed the Communications Section. The two sections merged in 1961 to become the Communications and Signal Division of the AAR, which has now been merged into AREMA.

Technical committees

AREMA has 29 technical committees, organized in six functional groups. The committees, whose volunteer members come from the railroad industry, meet on a regular basis and use their expertise to come up with the best methods to maintain a railroad.[1]

  • Structures
    • Buildings & Support Facilities (Committee 6)
    • Timber Structures (Committee 7)
    • Concrete Structures & Foundations (Committee 8)
    • Seismic Design for Railway Structures (Committee 9)
    • Structures Maintenance & Construction (Committee 10)
    • Steel Structures (Committee 15)
    • Clearances (Committee 28)
  • Passenger & Transit
    • Commuter & Intercity Rail Systems (Committee 11)
    • Rail Transit (Committee 12)
    • High Speed Rail Systems (Committee 17)
    • Electric Energy Utilization (Committee 33)
  • Track
    • Roadway & Ballast (Committee 1)
    • Rail (Committee 4)
    • Track (Committee 5)
    • Maintenance of Way Work Equipment (Committee 27)
    • Ties (Committee 30)
  • Engineering Services
    • Track Measuring Systems (Committee 2)
    • Environmental (Committee 13)
    • Yards & Terminals (Committee 14)
    • Economics of Railway Engineering & Operations (Committee 16)
    • Light Density & Short Line Railways (Committee 18)
    • Education & Training (Committee 24)
  • Communications & Signals
    • Scales (Committee 34)
    • Highway-Rail Grade Crossing Warning Systems (Committee 36)
    • Signal Systems (Committee 37)
    • Information, Defect Detection & Energy Systems (Committee 38)
    • Positive Train Control (Committee 39)
  • Maintenance
    • Engineering Safety Steering Team (Committee 40)
    • Track Maintenance Steering Team (Committee 41)

AREMA publishes recommended practices in two separate documents.[1]

Manual of Railway Engineering

The AREMA Manual for Railway Engineering contains principles, data, specifications, plans and economics pertaining to the engineering, design and construction of the fixed plant of railways (except signals and communications), and allied services and facilities.[2]

20 chapters are contained in four volumes, updated annually by the technical committees.

Consultants use the Manual's recommendations as a basis for design. Many railroads use the Manual as a basis for their track standards and may add to it to describe their specific needs.[3]

The AREMA Communications & Signals Manual of Recommended Practices contains recommended practices for railway communications and signaling.

24 sections are contained in five volumes, written and updated by the AREMA committees.[4]

  1. Administrative & General
  2. Railroad Signal Systems
  3. Highway-Rail Grade Crossing Warning Systems
  4. Yard Systems
  5. Defect Detection Systems
  6. Relays
  7. Signals
  8. Track Circuits
  9. Power Supply
  10. Wire & Cable
  11. Circuit Protection
  12. Switches
  13. Mechanical
  14. Electrical Devices, Foundations, Hardware Materials
  15. Materials
  16. Vital Circuit & Software Design
  17. Quality Principles
  18. Inside Plant
  19. Electrical Protection
  20. Inductive Interference
  21. Data Transmission
  22. Radio
  23. Communication-based Signaling
  24. Positive Train Control

These practices are required for railroads in the United States by the Federal Railroad Administration and in Canada by Transport Canada.[3]

Proceedings On-Line

An electronic version of AREMA's Procedures and Proceedings is available to members. The extensive library includes over 65 years of technical proceedings taken from the Roadmasters & Maintenance of Way Association Proceedings and the American Railway Bridge and Building Association proceedings.[5] Earlier Proceedings of the Annual Convention are available as digitized books.[6]

References

  1. ^ a b c d "AREMA web site". Archived from the original on 8 December 2007. Retrieved 2007-12-15. {{cite web}}: Unknown parameter |deadurl= ignored (|url-status= suggested) (help)
  2. ^ Technical Information Center Reference Library Catalog
  3. ^ a b Keller, Richard (2002). "Railway Track and Structures, What is the value of AREMA? (October 2002)". Railway Track and Structures. Retrieved 2007-12-15.
  4. ^ AREMA Communications & Signals Manual of Recommended Practices - Table of Contents
  5. ^ AREMA Electronic Document Library
  6. ^ AREMA Publications at the University of Illinois at Urbana-Champaign