Cao Lãnh Bridge

Coordinates: 10°24′46″N 105°39′07″E / 10.4127°N 105.6519°E / 10.4127; 105.6519
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by InternetArchiveBot (talk | contribs) at 12:14, 14 November 2016 (Rescuing 1 sources and tagging 2 as dead. #IABot (v1.2.7.1)). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Cao Lãnh Bridge
Coordinates10°24′46″N 105°39′07″E / 10.412678°N 105.651899°E / 10.412678; 105.651899
CarriesMotor vehicles, pedestrians and cyclists
CrossesTiền River, Mekong Delta, Vietnam
Characteristics
DesignCable-stayed bridge
Total length650 metres (2,130 ft)
Width24.5 metres (80 ft)
Height120 metres (390 ft)
Longest span350 metres (1,150 ft)
No. of spans150 + 350 + 150 m (cable stayed parts)
Clearance above37.5 metres (123 ft)
Design life100
History
DesignerWilbur Smith Associates – WSP Finland - Yooshin Engineering Corporation Joint Venture
Constructed byChinese Road and Bridge Corporation (CRBC) and the Vinaconex E&C[1]
Construction start2013
Construction endexpected 2017
Location
Map

The Cao Lãnh Bridge is a cable-stayed bridge under construction over the Tiền River, a branch of the Mekong River at Cao Lãnh in Vietnam. The bridge is one of three components of the planned Central Mekong Delta Connectivity Project (CMDCP). The other two components are the Vàm Cống Bridge at Vàm Cống and the 6 lane expressway connecting the two bridges.

The Cao Lãnh Bridge will be a cable-stayed bridge 650m long with a central span of 350m and a maximum clearance above high water level of 37.5m. The total length of the bridge, including the approach viaducts, will be 2,010 m; with spans of 17x40 + (150+350+150) + 17x40 (m). The cable-stayed bridge will have H-shape towers 120 meters high, cast in situ concrete girder superstructure with a double-plane of cables in a semi-fan type configuration. It will have six lanes for traffic.

The objective of the Central Mekong Delta Connectivity Project is to encourage the economic and social development of the Cửu Long Delta area.

The project is being developed with the financial assistance from the Asian Development Bank (ADB) and the Government of Australia.[2] It is jointly funded by the governments of Australia and Vietnam, and the ADB. The bridge will be the largest overseas assistance project undertaken by the Australian government costing A$160 million.

Construction

The groundbreaking ceremony for the Cao Lanh Bridge, held on 19 October 2013, was attended by senior officials from the Vietnamese and Australian Governments and the Asian Development Bank (ADB). The bridge is expected to be completed after 43 months in mid 2017.[3][1]

See also

References

  1. ^ a b "Building work begins on Cao Lanh Bridge". Viet Nam News. October 21, 2013. Retrieved 3 January 2014.
  2. ^ "Australia Raises Development Assistance for Vietnam Next Year". Vietnam Briefing. Asia Briefing Ltd. Retrieved 18 June 2012.
  3. ^ "Cao Lanh Bridge groundbreaking ceremony". Departmental Media Liaison. Parliamentary Secretary to the Minister for Foreign Affairs. 19 October 2013. Archived from the original on 3 January 2014. Retrieved 3 January 2014. {{cite web}}: Unknown parameter |deadurl= ignored (|url-status= suggested) (help)