Jump to content

Clyde Refinery

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by 203.9.33.7 (talk) at 06:43, 7 December 2015 (Remove illogical reference to 40% of Sydney's petroleum supply). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Clyde Refinery
CountryAustralia
ProvinceNew South Wales
CityClyde
Refinery details
OperatorShell Refining
Owner(s)Royal Dutch Shell
Commissioned1926 (1926)
Capacity85,000 bbl/d (13,500 m3/d)
No. of employees330
Refining unitscrude units, fluid catalytic cracker, light products plants, polymerization plants, amine plants, sulfur plants, impurities treatment plants

The Clyde Refinery was a crude oil refinery located in Clyde, New South Wales, Australia. It has a refinery capacity of 85,000 barrels per day (13,500 m3/d). It is operated by Shell Refining and owned by the Royal Dutch Shell one of the largest oil and gas companies in the world.[1]

History

Built in the early 1920s, it has been in operation longer than any other oil refinery in Australia.[1][2] It has been owned by Shell since 1928 and is located in Clyde where the Parramatta River and the Duck River join, 16 kilometres (9.9 mi) west of Sydney.[1] The refinery is also the site of the first polypropylene (PP) plant in Australia, that was commissioned by Shell in 1970–1971 and that has a capacity of 25,000 tonnes per year.[3] There is also another PP plant on site that is owned by LyondellBasell and has an annual production capacity of 170,000 tonnes.[4]

The refinery was shut down in November 2008 for maintenance works and restarted in July 2009 after nine months of repairs.[5]

Shell confirmed on 27 July 2011 that it will shut down refining operations at Clyde and convert the Clyde Refinery and Gore Bay Terminal into a fuel import facility by mid-2013. This was brought forward 9 months and the refinery closed in 2012, then converted into an import terminal.[6][7] This followed the initial announcement of intention pending board and employee consultation in April.[8]

Technical features

The refinery, which has around 330 workers, has a capacity of 85 thousand barrels per day (13.5×10^3 m3/d) and is supplied with oil from the nearby Gore Bay Terminal, also operated by Shell since its opening, located on a 10 hectares (25 acres) plot of land in Greenwich and opened in 1901. The oil transfer is made via an 19 kilometres (12 mi) underground pipeline that has a 300 millimetres (12 in) diameter.[1] The refinery processes around 4 million tonnes of crude oil annually.[1] The refinery usually supplies around 50% of the fuel consumed in New South Wales, Australia's most populous state.[9]

References

  1. ^ a b c d e "Shell Clyde Refinery & Gore Bay Terminal". Shell. 2010-09-05. Retrieved 2010-09-05.
  2. ^ "1-Shell Australia says to shut Clyde refinery in Nov". Reuters. 2008-10-09. Retrieved 2010-09-05.
  3. ^ "Global PP plant capacity". Grem-Chem. 2008-10-09. Retrieved 2010-09-05.
  4. ^ "Clyde Polypropylene Plant" (PDF). LyondellBasell. 2006-08-17. Retrieved 2010-09-05.
  5. ^ "Shell: to restart Australia Clyde refinery end July". Reuters. 2009-07-20. Retrieved 2010-09-05.
  6. ^ "Shell to cease refining at Clyde". Shell Australia. 2011-07-27. Retrieved 2011-07-27.
  7. ^ Clyde Russell (5 Apr 2013). "Time for Australia to decide if it wants oil refining". CNBC. Archived from the original on 6 Apr 2013.
  8. ^ "Shell says the refinery 'can't compete'". Sydney Morning Herald. 2011-04-12. Retrieved 2011-04-12.
  9. ^ "Shell to Start Clyde Refinery in 'Next Few Months'". Bloomberg. 2009-03-17. Retrieved 2010-09-05.