Fairmount Line
Template:MBTA infobox header | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Overview | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | Operating | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Owner | MBTA | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Eastern Massachusetts | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stations | 8 active 1 planned | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Type | Commuter rail line | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
System | Massachusetts Bay Transportation Authority | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | Keolis North America | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Daily ridership | 2,257 (2016 weekday average)[1] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | 9.2 mi (14.8 km) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Character | Elevated and surface-level | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 4 ft 8+1⁄2 in (1,435 mm) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Fairmount Line or Dorchester Branch is a line of the MBTA Commuter Rail system in Boston, Massachusetts, USA. Except for a short portion in Milton, it lies entirely within Boston, running southwest from South Station through the neighborhoods of Dorchester, Mattapan and Hyde Park. Weekend service began on November 29, 2014.[2][3] Most trains reverse direction at the south end at Readville, but a few continue onto the Franklin Line.
From the 1980s until 2012, the Fairmount Line had only five stations: three plus the two termini (South Station and Readville); however, three more stations were added to the line between 2012 and 2013. The first of these, Talbot Avenue, opened on November 12, 2012, followed by Newmarket and Four Corners/Geneva on July 1, 2013.[4][5] Due to neighborhood opposition over its design and location, another planned station, Blue Hill Avenue, has been delayed until 2019.[6] All stations on the line are fully handicapped accessible.
The corridor currently serves mostly low-income and working-class communities.[7] Despite frequent cancellations, a June 2016 count showed that ridership had nearly tripled from 2012.[1]
History
Former service
The line was built as an entrance to Boston for the Norfolk County Railroad and its successors, which originally had to rely on a connection via the Boston and Providence Railroad (B&P) from Dedham. The new line, built in 1855, split from the old one at Islington and ran northeast, crossing the Boston and Providence Railroad at Readville. It continued on through Hyde Park and Dorchester before crossing the Old Colony Railroad at South Bay Junction. The line continued into South Boston and made a sweeping curve along a trestle west to downtown Boston and a terminal at Dewey Square.
After several failed reorganizations, the line became part of the New York and New England Railroad (NY&NE) in 1873 and the New England Railroad in 1895. The New England was leased to the New York, New Haven and Hartford Railroad (NYNH&H) in 1898 and became their Midland Division. The line was operationally split at the junction with the Boston and Providence (also leased by the NYNH&H) at Readville, with many trains using the Midland from the southwest switching to the B&P, and some on the B&P from the south switching to the Midland.
In 1899, the new South Station union station opened, and a new set of tracks was built for the Midland on the west side of the Old Colony Railroad mainline, also part of the NYNH&H. The old South Boston station (located on West 1st Street between A and B Streets) was abandoned, being north of the junction with the new alignment, and the old terminal was no longer used, with the last bit of the old line (over Fort Point Channel) removed, and the rest used for freight only. South Boston was however served by the station that had been built for the Old Colony, now between the Old Colony and Midland tracks.
Under New Haven Railroad control, most intercity and some commuter trains from the former NY&NE (now the Franklin Line) switched onto the Northeast Corridor mainline (former B&P) at Readville, with Midland Branch service largely limited to local trains. Passenger service last ran on the Midland north of Readville in 1944 after a long period of declining ridership, though the line continued to be used for freight service to South Boston.
Restoration of passenger service
The MBTA had bought the Franklin Line tracks south of Readville in 1973. In 1976 it bought the Midland line from Readville to Southampton Street, by then merged into Penn Central railroad, and modernized it for use as a bypass while the Northeast Corridor was closed during the Southwest Corridor project.[3] On November 3, 1979, all trains on the Franklin and Providence/Stoughton Lines, as well as Amtrak intercity service, were rerouted via the Midland.[3] Three of the old stations - Fairmount, Morton Street and Uphams Corner - were rebuilt with bare asphalt platforms and opened for local commuter service. The restored service on the line was not intended to be permanent; however, it became locally popular.[8] Uphams Corner and Morton Street stations closed on January 30, 1981, as part of system-wide cuts that included the closure of the Woburn Branch.[3]
On October 5, 1987, the new Southwest Corridor opened to commuter service; most Franklin Line and Attleboro/Stoughton Line service was rerouted through it. The MBTA began operating the Fairmount Shuttle (later known as the Fairmount Line) between South Station and Fairmount on the old Midland tracks as a response to community demand. The stops at Morton Street and Uphams Corner were reopened. The shuttle was extended to Readville on November 30, 1987.[3] The route - sometimes called the Dorchester Branch by the MBTA - is used by some rush-hour Franklin Line trains to reduce load on the three-track Southwest Corridor and supplement the shuttle service. An MBTA study released in 2010 indicated that the most workable routing options for full-time service to Foxboro would involve extending some or all Fairmount Line trips to Foxboro over part of the Franklin Line.[9]
Some Providence/Stoughton Line trips used the Fairmount Line tracks until around 2004, when they were rerouted to the mainline to avoid passing through CSX's Readville 1-Yard. During disruptions on the Northeast Corridor north of Readville, Franklin and Providence service is sometimes diverted over the Fairmount Line.[10]
Improvement project
The Commonwealth of Massachusetts agreed in 2005 to make improvements on the Fairmount Line part of its legally binding commitment to mitigate increased air pollution from the Big Dig. To comply with the State Implementation Plan filed with the federal Environmental Protection Agency, these improvements must be complete by December 31, 2011. As an interim deadline, the Massachusetts Executive Office of Transportation was required to "complete final design, apply for all necessary permits and grants, file any required legislation, and initiate all public and private land acquisition" by December 1, 2009.[11]
The existing Uphams Corner and Morton Street stations have been rebuilt, featuring high-level train platforms for easy boarding, canopies, access ramps, electronic message boards, and pedestrian-friendly walkways. At the completion of the project, all stations on the line will be compliant with the Americans with Disabilities Act and be wheelchair-accessible.[12] Four new stations have been or will be constructed at Four Corners/Geneva, Talbot Avenue, Blue Hill Avenue, and Newmarket. Additionally, six bridges have been reconstructed, a new interlocking was added, and the signal system has been rebuilt.[12]
The MBTA has allocated $37 million to the project[citation needed] and $39 million has been allocated from the Commonwealth from the Emergency Needs Bond Bill of 2007.[11] The total cost of the project is estimated at $79.4 million.[13]
The addition of new stations and the upgrades to the existing infrastructure are projected to divert 220 daily trips from automobiles to transit,[14] and increase daily weekday ridership on the line from around 2,800 to 7,300 one-way trips.[15]
The plan adopted by the MBTA is based on the Indigo Line plan advanced by community activists, which was intended to make the characteristics of the line more like rapid transit than commuter rail, with increased frequency and number of stops. However, in its initial proposal the MBTA did not plan to increase service frequency to match rapid transit lines, nor to install pre-pay fare systems. The Indigo Line plan also called for the use of diesel multiple unit (DMU) cars for faster acceleration and deceleration, which was considered by the MBTA but not implemented initially because of lack of funding. As of October 2014[update], the proposed state budget includes some funds to purchase DMU railcars and the state plans to issue a request for proposals in December to purchase 30 DMUs, with deliveries starting in 2018 and completed by 2020.[2]
The first new station to be completed, Talbot Ave, opened on November 12, 2012.[4] Newmarket and Four Corners/Geneva opened on July 1, 2013. Five new round trips were also added, and Fairmount station was changed to fare zone 1A (to reduce fares to the same as rapid transit) for two years as a pilot program.[16] Ribbon-cutting ceremonies were held at Newmarket, Four Corners/Geneva Ave, and Talbot Ave on July 17, 2013.[17]
The location and design of Blue Hill Avenue has been more controversial. A public meeting held in April 2014 showed mixed local opinions about the stations, with some nearby residents feeling that the stop was imposed on the neighborhood by the MBTA without sufficient public input.[18] At a later meeting, the MBTA presented a plan under which construction would begin in September 2015 for a June 2017 opening.[19] On October 16, 2014, the MBTA announced that construction of Blue Hill Avenue station will resume, with 100 percent design expected in spring 2015 and construction to start that November for a December 2017 opening. The MBTA also then announced that hourly weekend service would begin on November 29, 2014 - the first weekend service on the line since passenger service was reintroduced in 1979.[2] As of October 2016[update], the station was in the bidding phase, with construction due to begin in 2017 for a 2019 opening.[6] Construction of the station began on June 3, 2017. To accommodate construction work at the station site, all weekend Fairmount Line trains in both directions has been cut back to Morton Street, with bus shuttles between Morton Street, Fairmount, and Readville, and late-night outbound Fairmount Line service on weekdays has been completely replaced with busses.[20][21]
A pedestrian bridge was built between Ceylon and Bird Streets in the 1980s (during the initial restoration of the line) to prevent pedestrians from dangerously crossing the tracks. Although well-trafficked, the bridge deteriorated due to lack of maintenance and became unsafe; lighting was not replaced after persistent vandalism, and robberies were common. Residents field a petition with the MBTA in 2010, but no actions were taken until the MBTA closed the bridge outright in March 2014 due to its condition.[22][23] As of April 2014[update] no plan is in place to repair or replace the bridge, which may be difficult and expensive as the Americans with Disabilities Act of 1990 requires handicapped-accessible ramps. The City of Boston and the MBTA each claim the other is responsible for maintaining and funding the bridge.[24]
The line was shut down on weekends in November and December 2017 for the installation of Positive Train Control equipment in order to meet a 2020 federal deadline.[25]
Foxboro service
A 2010 study on the potential addition of regular commuter service to the limited-service station at Foxboro included the possibility of extending Fairmount Line trains to Foxboro.[26] In August 2017, the MBTA Fiscal Control Board approved an 11-month pilot program to test commuter rail service to Foxboro, with service planned to begin sometime in late 2018 or early 2019, although Fairmount Line advocates warned it might reduce service quality to existing Fairmount Line stations.[27] In October 2017, the MBTA indicated that service would begin on May 20, 2019.[28] Some local advocates have criticized the extension, saying it would degrade service at existing stops for the benefit of wealthier suburban commuters. Others believe it may make higher-frequency service possible.[29]
Station listing
All current and future stations are in Boston, Massachusetts, though a short portion of the line south of River Street including the location of the former Glenwood station is in Milton. All stations on the line are handicapped accessible. Readville and Fairmount have short high-level platforms long enough for one pair of doors, while the remaining stations have full-length high-level platforms. (See MBTA accessibility).
Milepost[3][30] | Station | Opening date | Connections and notes |
---|---|---|---|
0.0 | South Station | 1899 | Connections to Amtrak's Lake Shore Limited, Northeast Regional, and Acela Express; MBTA Commuter Rail Greenbush Line, Old Colony Lines, Providence/Stoughton Line, Needham Line, Franklin Line, and Framingham/Worcester Line; MBTA rapid transit Red Line and Silver Line |
0.5 | South Boston | Closed; formerly located at West 4th Street | |
1.1 | South Bay Junction | never a station splits from Old Colony Lines (MBTA) before 1899, the line went northeast from here with a stop at South Boston and a terminal at the foot of Summer Street downtown | |
2.0 | Template:MBTA stations | July 1, 2013 | |
2.2 | Cottage Street | Closed; separate from Uphams Corner station[8] | |
2.4 | Template:MBTA stations | November 3, 1979 | Formerly Dudley Street (pre-1944) |
2.8 | Bird Street | Closed | |
3.5 | Template:MBTA stations | July 1, 2013 | Formerly Mount Bowdoin (pre-1944) |
4.1 | Harvard Street | Closed | |
4.5 | Template:MBTA stations | November 12, 2012 | First station to open under the Fairmount Line Improvements program |
4.7 | Dorchester | Closed; formerly located at Woodrow Avenue | |
5.3 | Template:MBTA stations | November 3, 1979 | Originally Forest Avenue (pre-1944) |
6.0 | Template:MBTA stations | 2019 (planned)[6] | Originally Mattapan (pre-1944) Under construction; planned to open in 2019 |
6.5 | Rugby | Closed; formerly located at Greenfield Road | |
6.8 | River Street | Closed | |
7.9 | Template:MBTA stations | November 3, 1979 | Sometimes (pre-1944) known as Hyde Park |
8.3 | Glenwood | Closed; formerly located at Glenwood Avenue. Sometimes known as Fairmount | |
9.2 | Template:MBTA stations | splits with connections to the Franklin Line and the Providence/Stoughton Line |
References
- ^ a b Nelson\Nygaard Consulting Associates (April 2017). "Increasing Ridership on the Fairmount Line: Final Report" (PDF). The Boston Foundation. p. 12.
- ^ a b c "Governor Patrick Announces Fairmount Line Service Upgrades". MassDOT Blog (Press release). Massachusetts Department of Transportation. 16 October 2014. Retrieved 17 October 2014.
- ^ a b c d e f Belcher, Jonathan (23 March 2013). "Changes to Transit Service in the MBTA district" (PDF). NETransit. Retrieved 8 January 2014.
- ^ a b Rocheleau, Matt (12 November 2012). "MBTA opens new commuter rail station at Talbot Avenue in Dorchester on Fairmount Line". Boston Globe. Retrieved 12 November 2012.
- ^ Rocheleau, Matt (25 June 2013). "Commuter rail gives Fairmount a boost". Boston Globe. Retrieved 5 July 2013.
- ^ a b c Garrett, Brianne (October 13, 2016). "Mattapan residents get T station update; officials get positive nods, hear concerns". Dorchester Reporter. Retrieved October 14, 2016.
- ^ Fairmount/Indigo Line Coalition Comments on Fare Increase, 6/29/2006
- ^ a b KKO and Associates (15 October 2001). Fairmount Line Feasibility Study: Task One:Assessment of Existing Conditions (Draft). Massachusetts Bay Transportation Authority.
- ^ Jacobs Engineering Group; Central Transportation Planning Staff; Gailbraith, Anne S. (1 September 2010). "Foxborough Commuter Rail Feasibility Study" (PDF). Massachusetts Bay Transportation Authority. Retrieved 8 January 2014.
- ^ "Electrical fire delays MBTA Commuter Rail, Amtrak: Fire at Forest Hills station goes to 2-alarms". WCVB. 4 April 2015. Retrieved 7 April 2015.
Passengers using the Franklin and Providence lines to get into Boston are being diverted to the Fairmount line to get into the city, according to commuter rail officials.
- ^ a b "State Implementation Plan – Transit Commitments: Status Report" (PDF). Massachusetts Executive Office of Transportation. 2 July 2007. Archived from the original (PDF) on 13 February 2012. Retrieved 3 August 2011.
{{cite web}}
: Unknown parameter|deadurl=
ignored (|url-status=
suggested) (help) - ^ a b "Fairmount Line Improvements". Massachusetts Bay Transportation Authority. Retrieved 3 August 2011.
- ^ Draft 2008-2013 MBTA Capital Improvement Plan, p. 128.
- ^ 2004 MBTA Program for Mass Transportation, Appendix, Table C-15.
- ^ Mac Daniel, "T To Begin Upgrade of Fairmount Rail Corridor," The Boston Globe, April 14, 2005
- ^ Rocheleau, Matt (24 June 2013). "Fairmount commuter rail line to see service boost, some cheaper fares". Boston Globe. Retrieved 24 June 2013.
- ^ "Patrick Administration Opens Three New Commuter Rail Stations". Massachusetts Bay Transportation Authority. 17 July 2013. Retrieved 17 July 2013.
- ^ "Everything Was Quiet & Business-like at Mattapan Transpo Meeting, And Then ..." Here and Sphere. 11 April 2014. Retrieved 13 April 2014.
- ^ "Blue Hill Ave Station Design Meeting" (PDF). Massachusetts Bay Transportation Authority. 15 September 2014. Retrieved 2 October 2014.
- ^ "Current Service Alerts, Advisories, Delays, and Outages". www.mbta.com. Massachusetts Bay Transportation Authority. 5 August 2017. Archived from the original on 5 August 2017. Retrieved 5 August 2017.
- ^ "FAIRMOUNT LINE effective June 3, 2017" (PDF). www.mbta.com. Massachusetts Bay Transportation Authority. 3 June 2017. Archived from the original (PDF) on 5 August 2017. Retrieved 5 August 2017.
{{cite web}}
: Unknown parameter|deadurl=
ignored (|url-status=
suggested) (help) - ^ Rosso, Patrick (19 December 2013). "Poor conditions persist at rusting Ceylon Street bridge". Boston Globe. Retrieved 28 July 2015.
- ^ Rosso, Patrick (6 March 2014). "Ceylon Street bridge closed by T; future unknown". Boston Globe. Retrieved 28 July 2015.
- ^ Powers, Martine (12 April 2014). "No solution in sight for Roxbury footbridge". Boston Globe. Retrieved 28 July 2015.
- ^ "Commuter Rail Positive Train Control (PTC): Update and Communications Plan for Suspension of Weekend Service" (PDF). Massachusetts Bay Transportation Authority. March 27, 2017. p. 6.
- ^ Jacobs Engineering Group (September 1, 2010). "Foxboro Commuter Rail Feasibility Study: Final Report" (PDF). Massachusetts Bay Transportation Authority.
- ^ "MBTA Board Approves Foxborough Commuter Rail Pilot". Foxborough, MA Patch. 2017-08-14. Retrieved 2017-08-19.
- ^ Gomes, Alexandra (November 1, 2017). "Foxboro's MBTA pilot program won't launch until 2019". Sun Chronicle. Retrieved November 8, 2017.
- ^ Vaccaro, Adam (November 13, 2017). "Fairmount or Foxborough Line? An urban-suburban transit debate". Boston Globe.
- ^ Leo S. (26 December 2009). "Railroad Stations in Dorchester". Dorchester Atheneum. Retrieved 8 January 2014.