Jump to content

Hitachi Zosen Inova

From Wikipedia, the free encyclopedia

Hitachi Zosen Inova (HZI) is a Swiss company specialising in energy from waste (EfW).[1] It is a subsidiary of the Japanese Hitachi Zosen Corporation since its acquisition in 2010 from A-TEC Industries.

History

[edit]

Inova formed, as L. von Roll Bamag AG, in 1933, as a spin-off of the company Gesellschaft der Ludwig von Roll'schen Eisenwerke, which dated from 1823, and specialised in waste treatment. By 1966 the company was operating in France, Germany, Japan and Sweden. In 1975 US operations began. The environmental arm of the company was called Von Roll Inova Group. In 2003 Austrian Energy & Environment Group (AE&E) bought Von Roll Inova on behalf of A-TEC Industries.[2]

Shares in Costain Group dropped when AE&E delayed £22 million in payments due for building the Riverside Resource Recovery ERF in London in November 2010.[3]

AE&E Inova changed its name to Hitachi Zosen Inova in December 2010 when A-TEC went into administration, and sold it to the Hitachi Zosen Corporation.[4][5][6][7][8]

In 2014 HZI acquired Axpo Kompogas, allowing it to sell anaerobic waste digestion technology in the UK.[9]

In 2021 HZI acquired from Viessmann Group the german company Schmack Biogas Service, a supplier in the biogas industry, founded in 1995, which was renamed Hitachi Zosen Inova Schmack.

In march 2024, HZI acquired Schmack Biogas Srl, an Italian biomethane EPC company formerly part of the German Schmack Biogas holding, from PLC Spa.[10]

Projects

[edit]

The company built an EfW plant in San Luis Obispo, California, in 2018, and has pioneered the production of synthetic carbon-neutral methane by electrolysis of water to form hydrogen then reacting it with carbon dioxide, a process it calls EtoGas.[11]

The Millerhill Recycling and Energy Recovery Centre outside Edinburgh opened in 2019, using combustion and XeroSorp flue gas treatment from HZI.[12] This is a dry adsorption system which uses sodium bicarbonate to clean the exhaust.[13]

In 2019 the company was contracted to build what would be the largest EFW plant in England, at Rookery South, near Stewartby in Bedfordshire. The project was expected to be completed in 2022, and was the firm's eleventh EfW project in the UK.[14] Local residents mounted a nine-year protest against the plant, which was being built on an abandoned quarry.[15]

The Newhurst EfW plant, in Shepshed in the East Midlands just off the M1, was expected to open in 2023. Ingo Eifert was the project leader for HZI. It was to use similar technology to that at Millerhill.[16]

HZI was building Western Australia's first EfW plant near Perth; it was expected to come online in late 2022.[17]

References

[edit]
  1. ^ "Hitachi Zosen Inova AG - Company Profile and News". Bloomberg.com. Retrieved 15 March 2020.
  2. ^ "AE&E Inova AG". Europe-Japan. Retrieved 25 March 2020.
  3. ^ Dunkley, Jamie (30 November 2010). "Costain in talks over Belvedere power plant after key contractor files for insolvency". Daily Telegraph. Retrieved 24 March 2020.
  4. ^ "Costain is owed £22m after customer goes into administration". Insider Media Ltd. 29 November 2010. Retrieved 24 March 2020.
  5. ^ "Costain receives outstanding Belvedere payment". Construction News. 21 December 2010. Retrieved 24 March 2020.
  6. ^ "AE&E Inova becomes Hitachi Zosen Inova". waste-management-world.com. 17 February 2011. Retrieved 15 March 2020.
  7. ^ "Hitachi Zosen acquires Energy-from-Waste (EfW) engineering firm AE&E Inova AG in Zürich, to become Hitachi Zosen Inova AG (HZI AG)". Europe-Japan. 20 December 2010. Retrieved 15 March 2020.
  8. ^ Watanabe, Chisaki; Urabe, Emi (4 July 2016). "Hitachi Zosen eyes M&A to beef up energy-from-waste business". Japan Times. Retrieved 25 March 2020.
  9. ^ Date, Will (31 October 2014). "Hitachi Zosen Inova to bring Swiss AD technology to UK". letsrecycle.com. Retrieved 24 March 2020.
  10. ^ Cotroneo, Marco (12 March 2024). "Hitachi Zosen Inova AG acquisisce l'85% di Schmack Biogas Srl: BonelliErede, Watson Farley & Williams e Ughi e Nunziante gli advisor legali". Il Sole 24 Ore. Retrieved 26 June 2024.
  11. ^ Wells, Aaron (26 February 2018). "Hitachi Zosen Inova: Waste to Energy Innovations". BOSS Magazine. Retrieved 24 March 2020.
  12. ^ Doherty, Joshua (23 September 2014). "FCC opens Millerhill EfW 'ahead of schedule'". letsrecycle.com. Retrieved 15 March 2020.
  13. ^ "Xerosorp – Flue Gas Treatment – Dry Scrubber by Hitachi Zosen Inova AG". www.environmental-expert.com. Retrieved 15 March 2020.
  14. ^ Larson, Aaron. "The Success Story Goes On: Hitachi Zosen Inova Wins Another Major Contract to Build an EfW Plant in the UK". Power Magazine.
  15. ^ "Waste-burner plant gets final go-ahead". BBC News. 27 January 2018. Retrieved 24 March 2020.
  16. ^ "Hitachi Zosen Inova to build Energy from Waste Plant in England". Highways Today. 12 February 2020. Retrieved 25 March 2020.
  17. ^ "Hitachi Zosen Inova selected for Energy from Waste project in Western Australia". Bioenergy International. 24 December 2019.
[edit]