Jump to content

Japan National Route 289

Coordinates: 37°24′23.36″N 139°14′8.05″E / 37.4064889°N 139.2355694°E / 37.4064889; 139.2355694
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by EmausBot (talk | contribs) at 00:39, 19 April 2013 (Bot: Migrating 1 interwiki links, now provided by Wikidata on d:Q11421436). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

National Route 289 shield
National Route 289
国道289号
国道289号
Route information
Length275.4 km (171.1 mi)
Existed1999–present
Major junctions
West endYoshida, Niigata
Major intersectionsCentral section incomplete
East endIwaki, Fukushima
Location
CountryJapan
Highway system

National Route 289 is an incomplete national highway in Japan that will eventually connect central Niigata with Iwaki, Fukushima with a total length of 275.4 km (171.1 mi).

At present, work is underway to complete an 18 km (11 mi) central section that will join the eastern and western portions together through the very northern part of the Japanese Alps on Niigata's and Fukushima's prefectural border.

When finished, traffic will be able to travel coast to coast across Japan in a link between the Sea of Japan and Pacific.

Sections

View from Route 289 outside Shitada village, eastern Niigata

Niigata

The western part of Route 289 begins in Yoshida passing east through the towns of Tsubame and Sanjo. It currently ends in the mountains 10 km south east of Shitada village.

Fukushima

The eastern part of Route 289 starts in Iwaki, Fukushima near Nakoso Station. It then heads west through Shirakawa and passed Shinshirakawa. It currently ends 12 km north west of Nishigō village.

Central part

Work to join the east and west sections began in 1999. But the scheme suffered a major setback after the Chūetsu earthquake in 2004 when landslips covered large parts of the route. In 2005/06 efforts were made to clear these blockages and restart building work.

The finished route, which presently is a dirt track and is only passable by 4x4s or construction traffic, will include several spanned bridges, avalanche covers and a 1.5 km tunnel.

A provisional completion date has been given as 2012.

37°24′23.36″N 139°14′8.05″E / 37.4064889°N 139.2355694°E / 37.4064889; 139.2355694