Kutch Express

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by 202.134.170.78 (talk) at 09:46, 2 October 2016 (→‎Train History). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Kutch Express
Overview
Service typeExpress train
LocaleMaharashtra, Gujarat
First service2 October 1984
Current operator(s)Western Railway
Route
TerminiBandra Terminus
Bhuj
Stops22
Distance travelled839 km (521 mi)
Average journey time15 hours 55 minutes (average)
Service frequencydaily
Train number(s)19131 / 19132
On-board services
Class(es)AC 1st Class, AC 2 tier, AC 3 tier, Sleeper Class, General Unreserved
Seating arrangementsYes
Sleeping arrangementsYes
Catering facilitiesAvailable, No Pantry Car
Observation facilitiesStandard Indian Railway coaches
Technical
Rolling stockRake sharing with 19115/19116 Sayajinagari Express
Track gauge1,676 mm (5 ft 6 in)
Operating speed110 km/h (68 mph) maximum
52.71 km/h (33 mph), including halts
Route map

The 19131/19132 Bandra (T) Bhuj Kutch Express is a express train belonging to Indian Railways that runs between Bandra Terminus and Bhuj It is a daily service. It operates as train number 19131 from Bandra Terminus to Bhuj and as train number 19132 in the reverse direction.

Initially it ran to/from Mumbai Central later it was amended to Bandra Terminus.

Coaches

The Bandra (T) Bhuj Kutch Express has 1 AC 1st Class, 1 AC 2 tier, 3 AC 3 tier, 13 Sleeper class & 6 General unreserved coaches.

As with most train services in India, Coach Composition may be amended at the discretion of Indian Railways depending on demand.

Loco 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
SLR UR UR H1 A1 B1 B2 S13 S12 S11 S10 S9 S8 S7 S6 S5 S4 S3 S2 S1 UR UR SLR

Service

The Bandra (T) Bhuj Kutch Express covers the distance of 839 km in 16 hours 15 mins as 19131 Bandra (T) Bhuj Kutch Express averaging 51.63 km/hr & 15 hours 35 mins as 19132 Bhuj Bandra (T) Kutch Express averaging 53.84 km/hr.

As the average speed of the train in both directions is below 55 km/hr, it does not have a superfast surcharge.

Routeing

The Kutch Express runs from Bandra Terminus via Surat, Vadodara Junction, Ahmedabad Junction, Gandhidham Junction to Bhuj.

Traction

Initially it would be hauled by a WCAM 1 engine until Ahmedabad. As Western Railway switched over to AC system in February 2012, it is hauled by a WAP 5 or WAP 4E engine from the Vadodara shed until Ahmedabad Junction after which a Ratlam based WDM 3A takes over until Bhuj. Occasionally a Vatva-based WDM 3A may be used. It reverses direction at Gandhidham Junction.

Train History

  • It was flagged off as 31DN/32UP Bombay Central Gandhidham Express with 9 halts.
  • It was extended to Bhuj railway station on 3 June 2001 after completion of the Gandhidham - Bhuj BG line.
  • On 8 February 2008 this train was shifted to Bandra Terminus.
  • It used to run as 9031/9032 BDTS - New Bhuj Kutch Express.
  • It was further renumbered as 9131/9132 from 15 June 2008.
  • It will be made a Superfast Train with new number 22955/22956 Kutch Superfast Express from Date 01 October 2016.

Timetable

19131 Bandra (T) Bhuj Kutch Express leaves Bandra Terminus on a daily basis and reaches the Bhuj the next day.

On return, the 19132 Bhuj Bandra (T) Kutch Express leaves Bhuj on a daily basis and reaches Bandra Terminus the next day.

Gallery

External links

  • "irse - Powered by ForumCo.com - The Forum Company". irse.forumco.com. Retrieved 28 April 2014.

References