Line 1 (Changsha Metro)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Slambo (talk | contribs) at 16:08, 26 November 2016 (stub sort). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Line 1
Overview
StatusOperational
OwnerCity of Guangzhou
LocaleChangsha, China
Termini
Stations20
Service
TypeRapid transit
SystemChangsha Metro
Services1
Operator(s)Changsha Metro Corporation
History
Opened28 June 2016
Technical
Line length23.55 km (14.63 mi)
CharacterUnderground and Elevated
Track gauge1,435 mm (4 ft 8+12 in)

Line 1 of the Changsha Metro (Chinese: 长沙地铁1号线; pinyin: Chángshā Dìtiě Yī Hào Xiàn) runs from Kaifu District to Tianxin District. It starts at Kaifu District Government and ends at Shangshuangtang. The total length is 23.55 km. Line 1 is color is red. This line began operation on June 28, 2016, from Kaifu District Government to Shangshuangtang.

Stations

Station Name
English
Station Name
Hanzi
Platform Types
Transfer/Connection
Location
Kaifu District Government 开福区政府 island (und) Kaifu
Machang 马厂
Beichen Delta 北辰三角洲
Kaifu Temple 开福寺
Wenchangge 文昌阁
Peiyuanqiao 培元桥
Wuyi Square 五一广场 side (und)  2  Kaifu/Furong/Tianxin
Huangxing Square 黄兴广场 island (und)
Nanmenkou 南门口 Tianxin
Houjiatang 侯家塘
Nanhu Road 南湖路 Tianxin/Yuhua
Huangtuling 黄土岭
Tujiachong 涂家冲 split (und)
Railway Campus 铁道学院 island (und) Tianxin
Youyi Road 友谊路
Provincial Government 省政府
Guihuaping 桂花坪
Datuo 大托
Zhongxin Square 中信广场 side (und)
Shangshuangtang 尚双塘 side (elev)