Mainpuri–Etawah line
Appearance
Mainpuri–Etawah line | |
---|---|
Overview | |
Status | Non-Operational |
Owner | Indian Railway |
Locale | Uttar Pradesh |
Termini |
|
Stations | 7 |
Service | |
System | Branch line |
Operator(s) | North Central Railway |
History | |
Opened | 28 December 2016 |
Technical | |
Line length | 55.16 km (34 mi) |
Track length | 1,676 mm (5 ft 6 in) |
Number of tracks | 1 |
Character | At Grade |
Track gauge | Broad gauge |
Electrification | No |
Operating speed | 100 km/h (62 mph) |
|
The Mainpuri – Etawah line is a railway line in Northern India. It connects Mainpuri to Etawah Junction via Saifai.
On December 28, 2015 first time a passenger train (71910-Agra Cantonment - Mainpuri DEMU) run on this railway track.[1][2][3]
In 2004, then President of India Dr. A. P. J. Abdul Kalam laid the foundation stone of this railway track in Saifai.[4]
Route and halts
Mainpuri – Etawah line | |||
---|---|---|---|
# | Station Name | Station Code | Connections |
1 | Etawah Junction | ETW | Howrah–Delhi main line |
2 | Baidpur | BPUR | |
3 | Saifai | SIPI | |
4 | Karhal | KAHL | |
5 | Bhujia | BUJA | |
6 | Kiratpur | KAPU | |
7 | Mainpuri | MNQ | Farrukhabad – Shikohabad Line |
References
- ^ http://www.amarujala.com/uttar-pradesh/etawah/passenger-start-running-at-etawah-mainpuri-line
- ^ http://www.livehindustan.com/news/agra/article1-Etawah-Mainpuri-station-reached-after-18-years-of-dreams-come-from-railroad-646337.html
- ^ "Mulayam's Saifai on railway map". The Times of India. 20 May 2016. Retrieved 30 May 2018.
- ^ http://www.jagran.com/uttar-pradesh/mainpuri-13520234.html