Myponga Wind Farm
Myponga Wind Farm | |
---|---|
![]() | |
Country | Australia |
Location | South of Adelaide |
Coordinates | 35°24′S 138°30′E / 35.4°S 138.5°E |
Status | Proposed |
Owner(s) | TrustPower |
Wind farm | |
Type | |
Power generation | |
Units operational | 16 |
Nameplate capacity | 48 MW |
The Myponga Wind Farm is a wind farm project proposed by TrustPower in the southern Mount Lofty Ranges, on the Fleurieu Peninsula 50 km south of Adelaide, South Australia. Development approval was granted in 2003,[1] and the project was planned to be operational by the end of 2010.[2]
In 2009, TrustPower announced that it would not proceed with the project, because the South Australian government had not approved variations to height, layout and turbine type in the existing planning approval.[3] The requested change was to reduce the number of turbines to 16 but increase their power output and increase the height of the turbines from 100 metres to 110 metres.[4]
Location
The site is 400m above sea level, between the towns of Myponga and Sellicks Beach.
See also
References
- ^ White, Rod (20 November 2003). "Support for Myponga wind farm". The Times.
- ^ Nankervis, David (23 August 2009). "Wind farm for Adelaide fringe". Sunday Mail.
- ^ "TPW: TrustPower decides not to proceed with Myponga Wind Farm" (Press release). Trustpower. 10 September 2009. Retrieved 16 October 2010.
- ^ Holloway, Paul (8 September 2009). "Myponga/Sellicks Hill Wind Farm". Government of South Australia. Retrieved 10 September 2009.