Stuttgart–Wendlingen high-speed railway

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Yobot (talk | contribs) at 15:02, 17 September 2013 (WP:CHECKWIKI error fixes / special characters in pagetitle using AWB (9485)). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Template:BS-header

Template:BS-table

Template:BSTemplate:BSTemplate:BSTemplate:BSTemplate:BS3Template:BS3Template:BS3Template:BS3Template:BS3Template:BSTemplate:BSTemplate:BSTemplate:BS
Overview
Line number4813[1]
Technical
Line lengthca. 25.2
Track gauge1435
Electrification
  • 15 kV 16.7 Hz AC
Operating speed250 max.
Maximum incline2.655[2][Comment 1]  %
(Chainage largely based on:[3][4])

|} The Stuttgart–Wendlingen high-speed railway is a proposed German high-speed line to be built as part of the Stuttgart 21 project. It runs from Stuttgart Hauptbahnhof via the Filder Tunnel to the Filder plain and from there to the Neckar valley at Wendlingen, where it runs on to the Wendlingen–Ulm high-speed line. It is part of the Paris-Budapest axis as defined by the European Union.

The line would connect the new Filder station via the Airport Loop, and another line would connect to the existing airport station.

The design speed of the approximately 25.2 km line is mostly 250 km/h. It would enter commercial service in December 2019.

Route

The line run from Stuttgart station to the south through the 9,468 metre long Filder Tunnel and surface southwest of Stuttgart-Plieningen near Stuttgart Airport and the A8 autobahn. It then runs to the east parallel with the A8 on its north side for about 10 kilometres to the Denkendorf service area. Between Denkendorf and Neuhausen the line runs under the A 8 in a 768 m long Denkendorf Tunnel and then runs parallel with it on its south side to the southeast. On the western abutment of the Neckar Bridge at Wendlingen the line becomes the proposed Wendlingen–Ulm high-speed line.

Comment

  1. ^ Maximum gradient in the zoning section 1.4, according to specified source. Since the documents have not been completed for the Section 1.3, the gradient in this area remains unclear. .

Notes

  1. ^ DB Projekt GmbH Stuttgart 21 (ed.): Umgestaltung des Bahnknotens Stuttgart: Ausbau- und Neubaustrecke Stuttgart – Augsburg. Bereich Stuttgart–Wendlingen mit Flughafenanbindung. Planfeststellungsabschnitt 1.2 Fildertunnel. Bau-km 0.432 – km 10,030
    Übersichtshöhenplan Gleisplanung, km 0,432 ... 2,191
    . Plan of November 2001, released on 10 December 2001, Anlage 2.6 of the zoning decision, sheet 1 of 4, plan established by order of the Federal Railway Office, Karlsruhe/Stuttgart branch.
  2. ^ DBProjektBau GmbH (ed.): Umgestaltung des Bahnknotens Stuttgart. Ausbau- und Neubaustrecke Stuttgart - Augsburg. Bereich Stuttgart - Wendlingen mit Flughafenanbindung. Planfeststellungsabschnitt 1.4 Filderbereich bis Wendlingen. Bau-km 15.3+11.0 bis 25.2+00
    Anlage 1: Erläuterungsbericht. Teil III: Beschreibung des Planfeststellungsabschnitts.
    Document as at 31 May 2006 plan established by the Federal Railway Office, Karlsruhe/Stuttgart branch by order of 30 April 2008 (document no. 59160 PAP-PS21-PFA 1.4), p. 1–5, 10–36, 44, 51, 91.
  3. ^ SMA und Partner AG (ed.): Aktennotiz: Neubauprojekt Stuttgart – Ulm. 4 June 2008. (PDF-file, 14 pages, 7.1 MB).
  4. ^ DBProjekt Stuttgart 21 (ed.): Umgestaltung des Bahnknotens Stuttgart. Ausbau– und Neubaustrecke Stuttgart – Augsburg. Bereich Stuttgart–Wendlingen mit Flughafenanbindung. Planfeststellungsabschnitt 1.2 Fildertunnel. Bauabschnitt km 0.432 – km 10.030.
    Übersichtslageplan Gleisplanung, km 9.775 … 10.030.
    Appendix 2.5, page 4A of 4, plan released on 10 December 2001, plan established by the Federal Railway Office, Karlsruhe/Stuttgart branch by order of 19 August 2005 (document no. 59160 PAP-PS21-PFA 1.2).