Talk:Sestao
This article is rated Stub-class on Wikipedia's content assessment scale. It is of interest to the following WikiProjects: | |||||||||||||||||||||
|
Project of Regeneration of Sestao
[edit]Analysis and future projection of Sestao (Bilbao, Spain) Sestao, an industrial area in disuse placed in the province of the Basque Country (Spain), is located in the estuary of Bilbao. It appeared due to diverse economic, social and political forces, but it was the economic strength of the iron industry the most important one. Over the last 20 years the city of Bilbao has transformed its riverbanks, pursuing its urban, environmental and economic improvement. The recovery of these old industrial spaces and the relocation of port activities to the outer bay will allow the city to face its river front and start a general process of urban transformation. The spaces previously occupied by the shipyards, containers or blast furnaces, will become promenades, parks, art galleries, new neighborhoods and areas of business of high environmental quality.
1:700.000 National scale
Sestao is located in the estuary of Bilbao (Spain). The industrial crisis of the 80 affected greatly Bilbao. The closure and modernization of major industries was a major impact on the whole environment of the river and, at the same time, an opportunity to recover valuable land for urban development of the city. The transformation of the city is creating an economic structure focused on services, culture and new industries. The riverbanks are now serving a urban strategy, environmental and economic improvement. The estuary is therefore the backbone of the area, but it is also a strong barrier that separates both margins of the river: one with a much more industrial character and another one much more residential. Sestao is the area that links all this area that will propose a real integral operation of all this area.
1:150:000 Regional scale
Although the area seems isolated, thanks to the station Urbinaga, is perfectly integrated in the network of Metro Bilbao, connecting Bilbao with the Right Bank and Left, offering an essential service to the future citizens of "La Punta".
1:15:000 Urban scale. Evolution of area through time
Redensification La Punta is an abandoned edge of the town. Sestao has the highest unemployment rate in the Basque Country, due to the closure of large companies because of their restructuring; despite this fact it has no social facilities to help this portion of the population to improve. Comparing the residential areas of Sestao and Barakaldo with "La Punta", it seems necessary to densify this area and thus strengthen the bond between Barakaldo and Sestao, and the relationship with the right bank of the river.
Urban barriers The growth of the town of Sestao is limited by the lack of developable land and severely limited by natural and artificial barriers. For this reason, it has reached a highly densified town with a network of small open spaces. Historically, The grew of the population was a consequence of the development of the industry, and not the industry a consequence of the human presence in the area. This defines the DNA of Sestao. It is a settlement that is born exclusively by the implantation of the heavy industry. Consumption and land distribution is based on the industry (now there is more floor dedicated to industrial than residential uses) and these industrial areas are located in the best situations the city. The margin facing the estuary is colonized exclusively for industry, and the least quality areas (up to sixty meters of altitude) is intended to construction of workers' housing.
Natural Processes - It is proposed that over time the vegetation in the low-lying industrial areas of the Galindo River estuary is slowly restored to a healthy state by actively cultivating the growth of plants that are naturally resistant to local soil contamination, and that improve soil and water quality through bio-remediation. Rather than a tabula rasa to be integrated into the city with a false topography, the industrial areas of Bilbao are in a new natural equilibrium condition. Working with these new natural conditions offers the possibility of an urbanism that combines urban and natural and responds to the fluctuations of the natural ecosystem of the river.
Since the appearance of the industry in 1875, the whole estuary became involved in the configuration of an industrial point of reference in the Spanish national scene of heavy industries. Meanwhile, the municipality of Sestao created the largest industrial base of the country. — Preceding unsigned comment added by Imc999 (talk • contribs) 20:03, 26 April 2017 (UTC)
Urbanistic analysis and regeneration project of Sestao Riverbanks
[edit]Over the last 20 years the city of Bilbao has transformed its riverbanks, pursuing its urban, environmental and economic improvement. The project of the renegeneration of Sesto Riverbanks is part of the regeneration strategies of the disused industrial spaces of the Bilbao Estuary, by means of a system of social spaces. — Preceding unsigned comment added by Imc999 (talk • contribs) 22:15, 3 May 2017 (UTC)
Project of Regeneration of Sestao
[edit]The recovery of the city of Sestao, its old industrial spaces and the relocation of port activities to the outer bay will allow the city to face its river front and start a general process of urban transformation. The spaces previously occupied by the shipyards, containers or blast furnaces, will become promenades, parks, art galleries , new neighborhoods and areas of business of high environmental quality.
Isabel Moya — Preceding unsigned comment added by Imc999 (talk • contribs) 19:53, 16 May 2017 (UTC)