Jump to content

Texas State Highway 350

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Ljthefro (talk | contribs) at 04:03, 20 December 2015 (Junction list: convert to templates). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

State Highway 350 marker
State Highway 350
Route information
Maintained by TxDOT
Length47.897 mi[1] (77.083 km)
Existedby 1943–present
Major junctions
South end I-20 BL in Big Spring
Major intersections I-20 in Big Spring
North end US 180 in Snyder
Location
CountryUnited States
StateTexas
Highway system
SH 349 SH 351
Colorado River crossing along State Highway 350

Route description

Beginning at a junction with Business Loop I-20 at Big Spring in Howard County, SH 350 intersects Interstate 20 on the northern edge of the town. The highway is known as Owen Street in Big Spring. SH 350 then runs northeast past Howard County municipal airport to its final junction with US 180 at Snyder in Scurry County, where it is known as College Avenue. The route traverses Howard, Mitchell and Scurry counties. Except for the portions in Big Spring and Snyder, most of the terrain covered by the highway is lightly populated agricultural and oil country. The route has remained essentially unchanged since its original designation in 1943.

Junction list

CountyLocationmikmDestinationsNotes
HowardBig Spring I-20 BL
I-20
FM 700
FM 820
FM 1205
Mitchell FM 1298
FM 1229
Scurry FM 1606
FM 1609
FM 2763
Snyder FM 1605

US 180 / Bus. US 84
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

References

  1. ^ Transportation Planning and Programming Division (n.d.). "State Highway No. 350". Highway Designation Files. Texas Department of Transportation. Retrieved 2007-02-01.