Jump to content

Tortona–Genoa high-speed railway

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Yobot (talk | contribs) at 12:31, 29 March 2018 (Removed invisible unicode characters + other fixes (Task 55), replaced: → (5) using AWB (12151)). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Tortona–Genoa high-speed railway
Overview
Other name(s)Third Pass (Italian: Terzo Valico)
StatusUnder construction
Connecting linesTurin–Genoa
WebsiteOfficial website
Service
TypeHigh-speed rail
SystemTrans-European Transport Networks
History
Commenced2013
Planned opening2022
Technical
Line length53 km (33 mi)
Electrification3 kV direct current
Operating speed250 km/h (160 mph)

The Tortona–Genoa high-speed railway, also known as Third Pass (Italian: Terzo Valico), is a railway designed for high-speed, high-capacity services linking Genoa to Tortona near Milan, Italy.[1] Works started in 2013 and the railway is expected to be completed by 2022.[1] The line will be 53 kilometres (33 mi) long, 36 kilometres (22 mi) of which being tunnels.[2] Further 25 kilometres (16 mi) of branches connecting the railway to existing lines are also planned.[1] The estimated cost for the construction of the railway is 6.2 billion euros.[1]

The railway is within the scope of the Trans-European Transport Networks project, specifically, of its Rhine–Alpine corridor.[3]

References

  1. ^ a b c d "Focus on - Cociv". www.terzovalico.it (in Italian). Retrieved 2018-03-20.
  2. ^ "Il tracciato - Cociv". www.terzovalico.it (in Italian). Retrieved 2018-03-20.
  3. ^ "Rhine-Alpine - Mobility and Transport - European Commission". Mobility and Transport. Retrieved 2018-03-20.