Turf City MRT station
Future Mass Rapid Transit (MRT) station | |||||||||||
General information | |||||||||||
Coordinates | 1°20′27″N 103°47′40″E / 1.340775°N 103.794332°E | ||||||||||
Owned by | Land Transport Authority | ||||||||||
Line(s) | |||||||||||
Platforms | 2 (1 island platform) | ||||||||||
Tracks | 4[3] (including 2 sidings) | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Platform levels | 3[3] | ||||||||||
Accessible | Yes | ||||||||||
History | |||||||||||
Opening | 2032 | ||||||||||
Electrified | Yes | ||||||||||
Services | |||||||||||
| |||||||||||
|
Turf City MRT station is a future underground Mass Rapid Transit station on the Cross Island line (CRL) located in Bukit Timah, Singapore. First announced in September 2022, the station is expected to be completed in 2032 along with the other CRL Phase 2 stations.
History
Turf City station was first announced on 20 September 2022 by Transport Minister S Iswaran. The station will be constructed as part of Phase 2 of the Cross Island line (CRL), a 15-kilometre (9.3 mi) segment spanning six stations from this station to Jurong Lake District station.[4][5] The station is expected to be completed in 2032.[6]
Built to serve a new residential development at Turf City, the tenants of the sports complex had to move out before the end of 2023.[7]
Through environmental impact studies, the station site was shifted slightly south from its original planned alignment.[8] This was to limit the construction area needed to build the station, reducing the impact on the wildlife in the surrounding forested area.[9]
Details
The station will serve the Cross Island line (CRL) and have an official station code of CR14. It will be located in the existing Turf Club City and The Grandstand.[10]
References
- ^ "跨岛线第二阶段将有六个地铁站 预计2032年竣工". 早报 (in Chinese). 20 September 2022. Retrieved 20 September 2022.
- ^ "குறுக்குத் தீவு ரயில்பாதையின் 2ஆம் கட்டம் 2032ல் திறப்பு". tamilmurasu (in Tamil). 21 September 2022. Retrieved 21 September 2022.
- ^ a b AECOM 1 2022, p. 75.
- ^ Chew, Hui Min (20 September 2022). "Six more MRT stations will be built in Phase 2 of Cross Island Line; to open by 2032". CNA. Retrieved 20 September 2022.
- ^ Kok, Yufeng (20 September 2022). "Cross Island Line phase 2 to open by 2032 with 6 MRT stations, from Turf City to Jurong Lake District". The Straits Times. Retrieved 20 September 2022.
- ^ "Cross Island Line Phase 2". LTA. 20 September 2022. Retrieved 20 September 2022.
- ^ Ong, Justin (23 September 2022). "No extension to end-2023 eviction date for Turf City tenants, some of whom have yet to find replacement sites". TODAY. Retrieved 27 September 2022.
- ^ AECOM Non-Technical Summary 2022, p. 8.
- ^ Ang, Qing; Kok, Yufeng (12 October 2022). "Cross Island Line phase 2 could have major impact on nearby forests: Study". The Straits Times. Retrieved 12 October 2022.
- ^ "CR14 Turf City". LTA. Retrieved 20 September 2022.
Bibliography
- Cross Island Line (CRL) Phase 2 Environmental Impact Study (EIS) – Turf City and Holland Plain (PDF). AECOM Singapore Pte Ltd. 2022.
- Environmental Impact Study (Turf City and Holland Plain) Volume 1 (PDF). AECOM Singapore Pte Ltd. 2022.
- Environmental Impact Study (Turf City and Holland Plain) Volume 2 (PDF). AECOM Singapore Pte Ltd. 2022.
- Environmental Impact Study (Turf City and Holland Plain) Volume 3 (PDF). AECOM Singapore Pte Ltd. 2022.
- Environmental Impact Study (Turf City and Holland Plain) Volume 4 (PDF). AECOM Singapore Pte Ltd. 2022.
- Environmental Impact Study (Turf City and Holland Plain) Volume 5 (PDF). AECOM Singapore Pte Ltd. 2022.