Jump to content

Wells Dam

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Bgwhite (talk | contribs) at 23:15, 28 September 2015 (remove/fix deprecated parameter using AWB (11624)). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Wells Dam
LocationChelan / Douglas counties, Washington
Opening dateAugust 22, 1967
Operator(s)Douglas County Public Utility District
Dam and spillways
ImpoundsColumbia River
Reservoir
CreatesLake Pateros
Total capacity331,200 acre⋅ft (0.4085 km3)
Power Station
Turbines10 [1]
Installed capacity851.4 MW [2]

Wells Dam is a hydroelectric dam located on the Columbia River, downstream from the confluence of the Okanogan River, Methow River, and the Columbia River in Washington State. The dam, associated structures, and machinery make up the Wells Hydroelectric Project. It is owned and operated by Douglas County Public Utility District.

The yellow cranes and other equipment are part of Wells Dam
Aerial view

It has produced electricity since August 22, 1967. Its operating license from the US Federal Energy Regulatory Commission is next up for renewal in 2012. In addition to the two public utility districts, the project provides electricity to Puget Sound Energy, Portland General Electric, PacifiCorp, Avista Corporation, and the Colville Indian Tribe.[3]

Its reservoir is named Lake Pateros. Just below and adjacent is Carpenter Island boat launch and fish hatchery river access.

See also

References