Jump to content

EcoTower

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Sadads (talk | contribs) at 23:03, 26 May 2021 (link sustainable design using Find link). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

EcoTower is a 32-story edifice with 25 office floors located in Bonifacio Global City, Metro Manila, Philippines. Classified as a Grade A building, EcoTower's construction began in 2011 and was completed in January 2013. The skyscraper has a total commercial and office space area of 29,000 square meters with a typical floor plate of 1,250 square meters.[1] It was designed by Jose Siao Ling & Associates and built by Monolith Construction. In the first two months of 2013, there is highest demand for office space in EcoTower, particularly from BPO firms as it is the only new building with accreditation from the Philippine Export Zone Authority (PEZA) at the time.[2]

Design and features

EcoTower has a modern architectural style and sustainable design. It has 90% floor efficiency and variable refrigerant flow air-conditioning systems.

The building is primarily built to provide smart office space for corporate tenants and business process outsourcing (BPO) firms.[3]

Location

EcoTower is located along major thoroughfare 32nd Street and is a short walk to transport hubs in Bonifacio Global City. It is within the vicinity of entertainment and dining hubs such as Bonifacio High Street and several residential condos.[4]

Known tenants

References

  1. ^ Ablan, Paul Johnson. "Eco Tower: Sustainable Design in the Heart of Taguig". Retrieved 2014-03-24.
  2. ^ "BPO firms drawn to entertainment attractions of Bonifacio Global City". Philippine Star. Retrieved Mar 24, 2014.
  3. ^ Jones Lang La Salle. "Ecotower".
  4. ^ Savills, K. M. C. "EcoTower". kmcmaggroup.com. Retrieved 2021-03-08.