Line 8 (Shenzhen Metro)
Line 8 | |
---|---|
8 | |
Overview | |
Status | Under Construction |
Locale | Shenzhen, China |
Termini | |
Stations | 6 |
Service | |
Type | Rapid transit |
System | Shenzhen Metro |
Operator(s) | SZMC (Shenzhen Metro Group) |
History | |
Planned opening | 2020 |
Technical | |
Line length | 12.34 km (7.67 mi) |
Character | Underground and elevated |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Line 8 of the Shenzhen Metro (also known as the Yantian Line) is currently under construction. Line 8 has a length of 12.34 km and a total of 6 stations. It connects Liantang with Yantian. Line 8 is the first line to serve Yantian District. The line may be built as a monorail rather than a traditional metro.[1] Construction may start in 2016, with the line scheduled to open in 2020.[2] This route is planned to connect with Line 2, with trains on Line 2 terminating at Yantian station.
References
- ^ "深圳地铁6条延长线线路图!看看哪些经过你家 - 深圳本地宝". jt.sz.bendibao.com. Retrieved 2016-06-11.
- ^ Sasin, Jasmin. "New Metro Lines to Start Construction in September". Shenzhen Standard. Retrieved 23 January 2014.