Line 8 (Suzhou Rail Transit)
Appearance
This article needs additional citations for verification. (December 2019) |
Line 8 | |
---|---|
8 | |
Overview | |
Status | Under construction |
Owner | Suzhou Rail Transit Co., Ltd |
Termini | |
Stations | 28[1] |
Service | |
Type | Rapid transit |
System | Suzhou Rail Transit |
Operator(s) | Suzhou Rail Transit Co., Ltd |
Technical | |
Line length | 35.6 km[1] |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Operating speed | 80 km/h[1] |
Line 8 of Suzhou Rail Transit (Chinese: 苏州轨道交通8号线) is a planned "L" shaped rapid transit line on both the east-west and north-south axes. It will serve Suzhou New District, Gusu District, Xiangcheng District, and Suzhou Industrial Park. Construction started on September 30, 2019,[2] and is expected to end in 2024. Line 8 is expected to open in September 2024.
Stations
Station name | Connections | Distance km |
Location | |||
---|---|---|---|---|---|---|
English | Chinese | |||||
Template:SZRT stations | 西津桥 | 3 | 0.000 | 0.000 | Xiangcheng | |
Template:SZRT stations | 长江路 | |||||
Template:SZRT stations | 时家桥 | |||||
Template:SZRT stations | 金业街 | 6 | ||||
Template:SZRT stations | 虎殿路 | |||||
Template:SZRT stations | 虎丘湿地公园 | |||||
Template:SZRT stations | 孙武纪念园 | 4 | ||||
Template:SZRT stations | 人民路 | |||||
Template:SZRT stations | 陆慕老街 | |||||
Template:SZRT stations | 阳澄湖中路 | 2 | ||||
Template:SZRT stations | 相城大道 | Xiangcheng | ||||
Template:SZRT stations | 相城区行政中心南 | 7 | ||||
Template:SZRT stations | 徐阳路 | |||||
Template:SZRT stations | 济学路 | |||||
Template:SZRT stations | 和顺路 | |||||
Template:SZRT stations | 唐庄 | 3 | ||||
Template:SZRT stations | 娄中路 | |||||
Template:SZRT stations | 苏州园区火车站 | 3 | ||||
Template:SZRT stations | 西沈浒路 | 8 | ||||
Template:SZRT stations | 时代广场 | 1 | ||||
Template:SZRT stations | 右岸街 | Wuzhong | ||||
Template:SZRT stations | 中塘公园 | 6 | ||||
Template:SZRT stations | 斜塘 | 5 | ||||
Template:SZRT stations | 东延路 | |||||
Template:SZRT stations | 仁爱路 | |||||
Template:SZRT stations | 松涛街 | 2 | ||||
Template:SZRT stations | 裕新路 | |||||
Template:SZRT stations | 车坊 | |||||
References
- ^ a b c "苏州市轨道交通8号线工可获省发改委批复 - 苏州轨道交通 Suzhou Rail Transit". www.sz-mtr.com. Retrieved 2019-12-22.
- ^ "苏州轨道交通8号线开工建设 - 苏州轨道交通 Suzhou Rail Transit". www.sz-mtr.com. Retrieved 2019-12-20.