North Luzon East Expressway

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by 112.211.18.200 (talk) at 09:34, 13 May 2017 (→‎Expressway Exit). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

North Luzon East Expressway
North East Luzon Expressway
Radial Road 7
Route information
Length92.1 km (57.2 mi)
Major junctions
FromCommonwealth Avenue (R-7), Balara, Quezon City
North Luzon Expressway (R-8) in Guiguinto, Bulacan
ToCabanatuan, Nueva Ecija
Location
CountryPhilippines
Major citiesQuezon City, San Jose del Monte, Gapan, Cabanatuan
TownsSanta Maria, Norzagaray, Angat, San Rafael, San Ildefonso, San Miguel, San Leonardo, Santa Rosa
Highway system
  • Roads in the Philippines

The North Luzon East Expressway is currently under-construction, 4-lane, 92.1-kilometer long limited-access toll expressway on the island of Luzon in the Philippines.[1]

Project Description

With a length of 92.1 km., the project consists of Phase I and Phase II and will form an important transport access in the eastern area of Central Luzon. NLEX East Expressway is up to Cabanatuan starting from the end point of La-Mesa Parkway and/or junction of C–6 in San Jose del Monte via Santa Maria, Bulacan, Norzagaray, Angat, San Ildefonso, San Miguel, Gapan, and Santa Rosa parallel to the Pan-Philippine Highway (AH26). Bridges will be required for the project to cross Angat River, Peñaranda River, and Pampanga River.[1] The completion of the expressway will be in 2022.[1]

The North Luzon Expressway East will be connected to the also under construction expressway, the Central Luzon Link Expressway.

Project Impact and Objectives

  • Eliminate heavy road traffic along the Central Luzon part of the Pan-Philippine Highway, which costs a significant amount to the economy everyday.
  • Provide significant reduction of travel time to Region II (Cagayan Valley).
  • To facilitate trade and commerce among the towns and cities in Nueva Ecija, Bulacan and Metro Manila.
  • To promote gender equality in job opportunity by the employment of a number of women.

[1]

Project Bidding

The bidding of the project goes to a private construction contractor.[1]

Project Timeline

  • On July 13, 2015, Pertconsult International submitted the Final Report of the Business Case Study to PPP Service.
  • The report was returned to Pertconsult on July 30, 2015 with comments and recommendations for consideration on the revision of the Final Report.
  • The Consultant re–submitted the Final Report of the Business Case Study to PPP Service on April 20, 2016 which is now under review.
  • DPWH has agreed that the Transaction Advisors (TAs) for the conduct of Feasibility Study will be procured through PDMF and included in the task of the TAs is to review and finalize the financial model provided by the consultant, Pertconsult International.
  • A meeting was held on 25 January 2017 at PPP Center to discuss the Technical Working Group (TWG) for the project and the schedule of procurement.
  • Ongoing preparation of Draft Terms of Reference (TOR) by PPP Center.

Expressway Exit

Phase I, Stage I - La Mesa Interchange Project[2]Phase I, Stage II - San Miguel JunctionPhase II - Cabanatuan Terminus

Project Status

  • Development Bank of the Philippines (DBP), in its letter dated February 11, 2015, expressed their interest in participating in the North Luzon East Expressway (NLEE) Project as Transaction Advisors.[1]
  • DPWH provided DBP with electronic copy of the Draft Final Report of the Business Case Study on March 3, 2015.[1]
  • DPWH quoted that the construction of the expressway will begin on Q4, 2016.[1]

See also

References

  1. ^ a b c d e f g h "NLEX East Expressway, Phase I and II". Department of Public Works and Highways. Retrieved 13 July 2015.
  2. ^ "North-Luzon East Expressway Project, Stage 1 (La Mesa Parkways Project) | Department of Public Works and Highways". www.dpwh.gov.ph. Retrieved 2017-05-01.

Template:PhilExpwy