Správa železnic

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Yobot (talk | contribs) at 13:12, 17 August 2014 (Remove invisible unicode control characters + other fixes using AWB (10381)). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Správa železniční dopravní cesty
Company typestate-owned company
IndustryInfrastructure & Tracks Proprietor, State Administrator
Founded1 January 2003
Headquarters,
Area served
Czech Republic
RevenueDecrease CZK 7.0 billion (2010)[1]
−199,987,000 Czech koruna (2018) Edit this on Wikidata
Increase CZK -1.5 billion (2010)[1]
Total assetsDecrease CZK 91.4 billion (2010)[1]
Total equityDecrease CZK 58.1 billion (2010)[1]
Number of employees
8,795 (31 December 2010)[1]
Websitewww.szdc.cz

Správa železniční dopravní cesty (English: Railway Infrastructure Administration) is the national railway infrastructure manager in the Czech Republic. Its main customers include passenger train operator České dráhy and its cargo subsidiary ČD Cargo. SŽDC was founded with the restructuring of ČD from 1 January 2002, but until 2008 much of the operations, maintenance and renewals was contracted back to ČD.[2] SŽDC manage 9,478 km of tracks in Czech Republic[3] - all main lines and almost all regional lines (except Nová Bystřice - Obrataň narrow gauge line and Šumperk - Kouty nad Desnou line).

In August 2010, SŽDC was ordered to stop work on all infrastructure projects, as part of broader government austerity measures,[4] but in September 2010 works were revieved for all projects, whose contractors agreed to grant discount against tender price.[5] In December 2010 the Minister of Transportation Vít Bárta proposed bringing it into a holding company alongside ČD to "make subsidies more transparent".[6]

In 2010 the revenues from rail network usage reached only CZK 4.3 billion, not even sufficient to cover personal expenses amounting to CZK 4.6 billion.[1] The key budget items allowing management and repairs of the rail network were therefore subsidies from the State Fund for Transport Infrastructure (CZK 8.2 billion) and from the state budget (CZK 1.8 billion).[1] Moreover, SŽDC received CZK 15 billion for modernization of the rail network.[1]

In 2012, SŽDC started its largest ever infrastructure project; a new railway line between Plzen and Rokycany, expected to cost 7.53bn CZK (with 85% funding from the EU). It is expected to be completed in Spring 2015. The new railway would be 14·1 km long, with a 4·15 km twin-bore tunnel.[7]

Priority projects

Priority projects for 2012-2015 are:[8]

The European Union will provide most of the funding for these projects.

References

  1. ^ a b c d e f g h Annual report of Správa železniční dopravní cesty, státní organizace for 2010
  2. ^ "CD Cargo leaves the nest". Railway Gazette International. 17 November 2007.
  3. ^ Basic Characteristics of SŽDC Railway Network
  4. ^ "Railway Gazette: Budget crunch hits Czech rail projects". Retrieved 2010-08-20.
  5. ^ E15: Bárta opět ustoupil: na železnici se může znovu stavět Template:Cs icon
  6. ^ "Railway Gazette: Reform looks to cut costs". Retrieved 2010-12-27.
  7. ^ "Railway Gazette: SZDC invites bids for construction of Plzen - Rokycany line". Railway Gazette International. Retrieved 26 February 2012.
  8. ^ "Czech infrastructure manager sets out 2015 priorities - Railway Gazette". Railway Gazette International. Retrieved 19 August 2012.

External links