add content from a new source; renamed the section "Geology of the geothermal reservoir" to "Kapoho Geothermal Reservoir" and make a second-level section before "Facilities"
Line 59: Line 59:
In the 1970s, the Hawaii Geothermal Project was formed to conduct research funded by federal and state grants.<ref name="Szvetecz thesis"/>{{rp|13-15}} After scientific studies of the geology and geothermal potential of the area were conducted by HGP, a site for the first well was chosen in 1975. Drilling began without environmental impact studies or a period for public input. At the time, the area around the drill site was very rural and undisturbed, but new subdivisions were planned nearby.<ref name="Szvetecz thesis"/>{{rp|14-15}} The well was occasionally allowed to discharge gas and fluid from the borehole, which created a loud noise and release large volumes of toxins and pollutants into the air. By 1976, three subdivisions nearby had been established and were beginning to see an influx of residents, including twelve families that now lived within one mile of the well. The continued noise pollution and toxic gas discharges began to cause concern and opposition from the new, nearby residents. Nonetheless, funds were secured from the federal and state governments to begin the next step of the project: turning the geothermal energy of the well into electricity.<ref name="Szvetecz thesis"/>{{rp|15-19}} Although HELCO was among the stakeholders in the project, they assured their stockholders that they would not invest the company's capital in the project due to the volcanic and seismic risk at the site.<ref name="Szvetecz thesis"/>{{rp|19}}
In the 1970s, the Hawaii Geothermal Project was formed to conduct research funded by federal and state grants.<ref name="Szvetecz thesis"/>{{rp|13-15}} After scientific studies of the geology and geothermal potential of the area were conducted by HGP, a site for the first well was chosen in 1975. Drilling began without environmental impact studies or a period for public input. At the time, the area around the drill site was very rural and undisturbed, but new subdivisions were planned nearby.<ref name="Szvetecz thesis"/>{{rp|14-15}} The well was occasionally allowed to discharge gas and fluid from the borehole, which created a loud noise and release large volumes of toxins and pollutants into the air. By 1976, three subdivisions nearby had been established and were beginning to see an influx of residents, including twelve families that now lived within one mile of the well. The continued noise pollution and toxic gas discharges began to cause concern and opposition from the new, nearby residents. Nonetheless, funds were secured from the federal and state governments to begin the next step of the project: turning the geothermal energy of the well into electricity.<ref name="Szvetecz thesis"/>{{rp|15-19}} Although HELCO was among the stakeholders in the project, they assured their stockholders that they would not invest the company's capital in the project due to the volcanic and seismic risk at the site.<ref name="Szvetecz thesis"/>{{rp|19}}


An experimental 3&nbsp;MW generator was completed in 1981 and remained operational throughout the 1980s. However, families continued to build and move into the nearby subdivisions, resulting in several attempts and a failed lawsuit to stop the noise and pollution generated from the site.<ref name="Szvetecz thesis"/>{{rp|20-29}} Despite the opposition and the operating losses incurred by operating and maintaining the generator, there was enough support to keep the generator operating. In April 1989, county officials raised concerns about the condition of the facility following a minor blowout and considered reviewing and possibly revoking the operating permit for the site. After several additional incidents at the site in 1989, the facility was ordered to be shut down, which occurred on December 11.<ref name="Szvetecz thesis"/>{{rp|30-32}}
An experimental 3&nbsp;MW generator was completed in 1981 and remained operational throughout the 1980s. However, families continued to build and move into the nearby subdivisions, resulting in several attempts and a failed lawsuit to stop the noise and pollution generated from the site.<ref name="Szvetecz thesis"/>{{rp|20-29}} Since the site was within a high lava hazard zone, the generator was built on skids and housed in a building which included a crane so that the generator could be removed if lava flows threatened the facility.<!-- <ref name="Boyd et al 2002"/>{{rp|13}} --> Additionally, the wellhead was housed in a concrete bunker that could be sealed to prevent lava from damaging the wellhead.<ref name="Boyd et al 2002"/>{{rp|13}} Despite the opposition and the operating losses incurred by operating and maintaining the generator, there was enough support to keep the generator operating. In April 1989, county officials raised concerns about the condition of the facility following a minor blowout and considered reviewing and possibly revoking the operating permit for the site. After several additional incidents at the site in 1989, the facility was ordered to be shut down, which occurred on December 11.<ref name="Szvetecz thesis"/>{{rp|30-32}} During its life, the HGP generator produced between 15-19&nbsp;million [[kilowatt hour]]s of electricity annually.<ref name="Boyd et al 2002"/>{{rp|13}}


===Puna Geothermal Venture===
===Puna Geothermal Venture===
Line 124: Line 124:


Despite the geothermal plant’s shutdown, Hawaii Electric Light did not expect [[Rolling blackout|blackouts]] on the Big Island to be caused by insufficient power generation as older, diesel-fueled generators were brought on-line.<ref>{{cite news |last1=Proctor |first1=Darrell |title=Officials Say No Risk of Blackout From Lava Breach at Hawaii Geothermal Plant |accessdate=30 May 2018 |work=Power Magazine |date=May 23, 2018}}</ref><ref>{{cite press release |author=<!--Staff writer(s); no by-line.--> |title=Hawaii Electric Light expects sufficient power even with geothermal plant shut do |url=https://www.hawaiielectriclight.com/hawaii-electric-light-expects-sufficient-power-even-with-geothermal-plant-shut-down |publisher=Hawaii Electric Light |date=2018-05-03 |access-date=2018-05-30}}</ref> According to PGV's vice president of community affairs, the wells can be put back into operation.<ref name="KHON May 28"/>
Despite the geothermal plant’s shutdown, Hawaii Electric Light did not expect [[Rolling blackout|blackouts]] on the Big Island to be caused by insufficient power generation as older, diesel-fueled generators were brought on-line.<ref>{{cite news |last1=Proctor |first1=Darrell |title=Officials Say No Risk of Blackout From Lava Breach at Hawaii Geothermal Plant |accessdate=30 May 2018 |work=Power Magazine |date=May 23, 2018}}</ref><ref>{{cite press release |author=<!--Staff writer(s); no by-line.--> |title=Hawaii Electric Light expects sufficient power even with geothermal plant shut do |url=https://www.hawaiielectriclight.com/hawaii-electric-light-expects-sufficient-power-even-with-geothermal-plant-shut-down |publisher=Hawaii Electric Light |date=2018-05-03 |access-date=2018-05-30}}</ref> According to PGV's vice president of community affairs, the wells can be put back into operation.<ref name="KHON May 28"/>

==Kapoho Geothermal Reservoir==<!-- "Kapoho Geothermal Reservoir" redirects to this section, if section name is changed, please edit the redirect page -->
PGV is located in the East Rift Zone of the [[Kīlauea]] volcano, which forms the Big Island of Hawaii. The geothermal energy reservoir discovered by the Hawaii Geothermal Project in this location is known as the Kapoho Geothermal Reservoir.<ref name="Boyd et al 2002">{{cite journal |last1=Boyd |first1=Tonya L. |last2=Thomas |first2=D. |last3=Gill |first3=A. T. |title=Hawaii and Geothermal-What Has Been Happening |journal=Geo-Heat Center Quarterly Bulletin |date=September 2002 |volume=23 |issue=3 |pages=11-21 |url=http://hahaha.typepad.com/files/geoheat.oit.edu-1.pdf |accessdate=14 June 2018}}</ref>{{rp|11}} The geothermal energy potential of the East Rift Zone is estimated to exceed 200&nbsp;MW.<ref name="EERE pamphlet"/> The geothermal reservoir is contained within basaltic rock and relies on the permeability of two major fracture systems. Both fracture systems have large openings, recorded by the drop of {{convert|8.5|in|abbr=on}} drillbits for up to {{convert|30|ft|abbr=on}}.<ref name="Fitch and Matlick 2008"/>


==Facilities==
==Facilities==
Line 199: Line 202:
|mark-title6= Pad B
|mark-title6= Pad B
}}
}}
===Geology of geothermal reservoir===
The facility is located in the East Rift Zone of the [[Kīlauea]] volcano, which forms the Big Island of Hawaii. The geothermal energy potential of the East Rift Zone is estimated to exceed 200&nbsp;MW.<ref name="EERE pamphlet"/> The geothermal reservoir is contained within basaltic rock and relies on the permeability of two major fracture systems. Both fracture systems have large openings, recorded by the drop of {{convert|8.5|in|abbr=on}} drillbits for up to {{convert|30|ft|abbr=on}}.<ref name="Fitch and Matlick 2008"/>


===Power plants===
===Power plants===

Revision as of 05:52, 14 June 2018

Puna Geothermal Venture
Map
CountryUnited States
LocationPuna, Hawaii
Coordinates19°28′43″N 154°53′19″W / 19.478716°N 154.888679°W / 19.478716; -154.888679
StatusMothballed
Construction began1989
Commission date1993
OwnerOrmat Technologies
Geothermal power station
TypeBinary cycle
Wells11
Max. well depth8,297 feet (2,529 m)
Power generation
Units operational0 (closed in May 2018 due to nearby eruption)
Nameplate capacity38 MW
External links
Websitehawaiianelectric.com/clean-energy-hawaii/clean-energy-facts/renewable-energy-sources/geothermal/puna-geothermal-venture-(pgv)
CommonsRelated media on Commons

The Puna Geothermal Venture (PGV) is a currently nonoperational geothermal energy power plant on the island of Hawaii, the largest island in the state of Hawaii. The plant was shut down shortly after the start of the May 2018 lower Puna eruption. The eruption caused lava to flow over at least two geothermal wells that had been preventatively quenched and capped when lava fountains appeared nearby.[1]

PGV was the first and only commercially-productive geothermal electrical plant in Hawaii. Constructed on a site adjacent to failed experimental wells drilled and operated by the Hawaii Geothermal Project in the 1970s and 80s, construction on the generating facility began in 1989 and was completed in 1993.

Prior to the shutdown and lava damage, the plant had an installed generating capacity of 38 MW[2] from six production wells and five injection wells along Kīlauea’s East rift zone, which had provided approximately 25% of the island’s power. Power generated was sold to the Hawaiian Electric Industries (also known as HELCO) to supply the island’s electric power customers.[3]

History

The first and only geothermal energy plant in Hawaii, the plant began generating power in 1993, and is owned by Ormat Technologies which purchased it in 2004.[4]

Early geothermal exploration and development

The first exploratory geothermal wells in Kapoho were drilled in 1961-62.[5]: 9  The effort was spearheaded by wealthy local landowner Richard Lyman following a trip to Japan, where he learned of a project to lay underwater power cables between the country's islands. Upon returning to Hawaii, Lyman promoted geothermal electrical generation in the Puna district, distributed to Oahu and other population centers by underwater electric cables, as a way of developing the then-newly-admitted-state's economy. He found business partners to establish Hawaii Magma Power in 1961 to develop geothermal energy in the region. Several exploratory drills were made before the company determined that there was insufficient geothermal potential, although Lyman claimed to the Honolulu Advertiser that the company "had mechanical difficulties and gave up."[6]: 12–13 

Hawaii Geothermal Project

In the 1970s, the Hawaii Geothermal Project was formed to conduct research funded by federal and state grants.[6]: 13–15  After scientific studies of the geology and geothermal potential of the area were conducted by HGP, a site for the first well was chosen in 1975. Drilling began without environmental impact studies or a period for public input. At the time, the area around the drill site was very rural and undisturbed, but new subdivisions were planned nearby.[6]: 14–15  The well was occasionally allowed to discharge gas and fluid from the borehole, which created a loud noise and release large volumes of toxins and pollutants into the air. By 1976, three subdivisions nearby had been established and were beginning to see an influx of residents, including twelve families that now lived within one mile of the well. The continued noise pollution and toxic gas discharges began to cause concern and opposition from the new, nearby residents. Nonetheless, funds were secured from the federal and state governments to begin the next step of the project: turning the geothermal energy of the well into electricity.[6]: 15–19  Although HELCO was among the stakeholders in the project, they assured their stockholders that they would not invest the company's capital in the project due to the volcanic and seismic risk at the site.[6]: 19 

An experimental 3 MW generator was completed in 1981 and remained operational throughout the 1980s. However, families continued to build and move into the nearby subdivisions, resulting in several attempts and a failed lawsuit to stop the noise and pollution generated from the site.[6]: 20–29  Since the site was within a high lava hazard zone, the generator was built on skids and housed in a building which included a crane so that the generator could be removed if lava flows threatened the facility. Additionally, the wellhead was housed in a concrete bunker that could be sealed to prevent lava from damaging the wellhead.[7]: 13  Despite the opposition and the operating losses incurred by operating and maintaining the generator, there was enough support to keep the generator operating. In April 1989, county officials raised concerns about the condition of the facility following a minor blowout and considered reviewing and possibly revoking the operating permit for the site. After several additional incidents at the site in 1989, the facility was ordered to be shut down, which occurred on December 11.[6]: 30–32  During its life, the HGP generator produced between 15-19 million kilowatt hours of electricity annually.[7]: 13 

Puna Geothermal Venture

Map
About OpenStreetMaps
Maps: terms of use
4km
2.5miles
Leilani Estates
Leilani Estates
Puna Geothermal Venture
Puna Geothermal Venture

In 1980, HELCO requested a proposal for 25 MW of geothermal electricity generation. To answer the request, a joint venture was formed the same year between two of Lyman's companies and two other companies to produce geothermal energy on a 500-acre parcel of land leased from the Lyman family. The joint venture was renamed Puna Geothermal Venture in 1981. Over the following years, PGV drilled three wells, but all suffered from mechanical failures of their well casings and were unusable for production.[6]: 39–41 

In 1986, PGV secured a contract with HELCO to supply 25 MW of electricity by 1993. PGV promised that they would be using new technology that would result in zero emissions and operate at a drastically lower noise level. In 1989, when the HGP facility was facing growing problems, the PGV proposed facility managed to overcome enough local opposition to be granted a permit from the local planning commission.[6]: 41–45 

The plant has raised some concerns with local residents as a result of occasional toxic emissions.[8] In 1991, well KS-8 suffered a blowout, causing the state to suspend the permits for the plant.[9][10] In 2016 the plant’s owners were found to be in violation of U.S. Environmental Protection Agency standards regarding hydrogen sulfide releases and was fined $76,500 for two incidents in 2013.[11][12] Additional concerns and opposition to the plant have been raised by Native Hawaiians, who view all forms of volcanic activity as manifestations of the goddess Pele. To the Native Hawaiians who revere Pele, geothermal wells and energy production are a desecration of her body and spirit.[5]: 7 

In 2005 during the drilling of the KS-13 well, magma was encountered at a depth of 8,163 ft (2,488 m). The borehole had to be redrilled several times as the magma flowed up the borehole, cooling into clear, colorless glass. The 1922°F (1050°C) magma was a dacitic magma—similar to the granitic rock that forms continents—consisting of approximately two-thirds silica, which contrasts with the dark, iron-rich basaltic rock that forms most of the Hawaiian Islands. It was encountered after drilling through a 240 ft (73 m) layer of diorite igneous rock, which suggested to researchers that the magma had chemically separated as it dwelled for a long period of time.[13][14][15][16] As quoted in the journal Nature, the team said it was possibly the first time that "the actual process of differentiation of continental-type rock from primitive ocean basalt has been observed in situ".[13] Magma specialist Bruce Marsh of Johns Hopkins University described the uniqueness of the encounter: "Before, all we had to deal with were lava flows; but they are the end of a magma's life. They're lying there on the surface, they've de-gassed. It's not the natural habitat. It's the difference between looking at dinosaur bones in a museum and seeing a real, living dinosaur roaming out in the field."[16]

PGV had a generating capacity of 25 MW when it opened in 1993, which was expanded to 30 MW in 1995 and 38 MW in 2012.[5]: 9  In 2015, HELCO announced that Ormat was selected as the winner of a bid to add 25 MW of geothermal generating capacity in the Puna district.[17][8][5]: 25  In March 2018, Ormat announced their plan to increase production at the plant by 8 MW—from 38 MW to 46 MW—by 2020.[18]

2018 lava flow, power plant closure and lava damage

Puna Geothermal Venture
Click here to expand this image
Southern part of the Puna Geothermal Venture (red circle) is seen nearby the lava fountains of Kīlauea volcano

On May 3, 2018 earth fissures opened inside and around the Leilani Estates subdivision near the PGV plant, following hundreds of earthquakes over the first two days of May, resulting in concerns of possible toxic hydrogen sulfide gas releases and explosions at the geothermal power facility. According to PGV's vice president of community affairs, PGV began preemptively shutting down equipment and inventorying its stockpile of highly-flammable pentane when the frequency of earthquakes began increasing and the first cracks appeared in Leilani Estates on May 1-2; the plant was taken off-line approximately three hours after it received the first report that lava had begun to emerge from the ground on May 3.[19] All pentane stored at PGV, approximately 60,000 US gallons (230,000 L; 50,000 imp gal), were removed by the morning of May 10.[20]

Over the next couple of weeks, the wells were quenched with cold water to stabilize them—where the weight of the cold water was sufficient to prevent steam from rising from the bottom of the well—and allow them to be plugged. One well, KS-14, possibly being super-heated from close proximity to magma, could not be quenched and was filled with a drilling mud in an attempt to stabilize it. The wells were then sealed with metallic plugs, which arrived at the site on May 22, that officials with PGV claim can withstand 2000°F (1100°C) lava.[21][22][23][24][25][26] According to Tom Travis of the Hawaii Emergency Management Agency, he researched and was unable to find any precedent for lava overrunning a geothermal well that had been shut-down like the wells at PGV. The PGV team had spoken with scientists in Iceland that have operated wells within lava fields and provided insights into how lava might affect the wellhead of a shutdown well.[26]: 8:03-9:26 

Lava approached several of the capped wells on May 27.[1] Two of the 11 capped geothermal wells, identified as KS-5 and KS-6, were covered by the lava from fissures 7 and 21 on May 27 and 28.[27][28] The event was the first time lava had covered a geothermal well.[29][30] On May 30 a substation and a warehouse containing a drilling rig were overrun and destroyed by molten rock, with the main access road to the facility cut.[31]

Despite the geothermal plant’s shutdown, Hawaii Electric Light did not expect blackouts on the Big Island to be caused by insufficient power generation as older, diesel-fueled generators were brought on-line.[32][33] According to PGV's vice president of community affairs, the wells can be put back into operation.[23]

Kapoho Geothermal Reservoir

PGV is located in the East Rift Zone of the Kīlauea volcano, which forms the Big Island of Hawaii. The geothermal energy reservoir discovered by the Hawaii Geothermal Project in this location is known as the Kapoho Geothermal Reservoir.[7]: 11  The geothermal energy potential of the East Rift Zone is estimated to exceed 200 MW.[34] The geothermal reservoir is contained within basaltic rock and relies on the permeability of two major fracture systems. Both fracture systems have large openings, recorded by the drop of 8.5 in (220 mm) drillbits for up to 30 ft (9.1 m).[35]

Facilities

Map
About OpenStreetMaps
Maps: terms of use
200m
220yds
Pad A
Pad A
Pad B
Pad B
Binary cycle plant
Binary cycle plant
Combined cycle plant
Combined cycle plant
Pad F
Pad F
Pad E
Pad E
Pad D
Pad D
Location of plants and well pads[5][36]

Power plants

There are two power plants in the Puna Complex. The first plant consists of ten Combined cycle Ormat Energy Converters (OEC) made up of ten steam turbines and ten binary turbines.[37] Production of electricity began on April 22, 1993.[34] The second plant consists of two Binary cycle OECs and was placed in service in 2011 and commenced commercial operation in 2012. There is a plan to replace the first plant's ten old OECs with two new OECs which increase the generating capacity from 38 MW to 46 MW.[37]

Wells

As of December 2017, there were six production wells and five injection wells in the Puna Complex.[37]

List of wells as of September 2014[38]
Well Wellfield Type Depth
Kapoho State 1A (KS-1A) Pad A Injection
Kapoho State 3 (KS-3) Pad E Injection
Kapoho State 5 (KS-5) Pad E Production
Kapoho State 6 (KS-6) Pad E Production 6,532 feet (1,991 m)
Kapoho State 9 (KS-9) Pad A Production
Kapoho State 10 (KS-10) Pad A Production 5,210 feet (1,590 m)
Kapoho State 11 (KS-11) Pad A Injection 6,500 feet (2,000 m)
Kapoho State 13 (KS-13) Pad A Injection 8,297 feet (2,529 m)
Kapoho State 14 (KS-14) Pad E Production
Kapoho State 15 (KS-15) Pad B Injection
Kapoho State 16 (KS-16) Pad A Production
Kapoho State 17 (KS-17) Pad E Production

As of 2008, there are five active production wells all of which have a surface elevation of 620 ft (190 m) above sea level and produce a mixture of steam and brine. The five wells produced an average of 600,000 lb/hour (270,000 kg/hour) of steam and 1,200,000 lb/hour (545,000 kg/hour) of brine. The temperature of fluids emerging from the production wells is approximately 640°F (338°C), which is returned to the injection wells at approximately 300-400°F (150-200°C) after being used to generate electricity.[35][39]

Alternative uses of geothermally-heated fluids

In addition to electricity generation, additional uses of the facility have been suggested. A paper presented by Andrea Gill of the Hawaii Deptartment of Business, Economic Development, and Tourism—on behalf of a working group established to consider direct uses of the geothermal energy at PGV and its vicinity—outlined potential direct uses of the fluids at PGV as well as shallow groundwater wells in its vicinity, including fruit and macadamia nut dehydration, aquaculture and greenhouse heating, pasteurization and sterilization, geothermal/health spas, and geothermal heat pumps.[39] At PGV, hot brine after being utilized to generate electricity is approximately 300-400°F (150-200°C) when it is reinjected into the earth; the brine could be tapped for its thermal energy before being reinjected. Water wells under 750 ft (230 m) in the vicinity of PGV have recorded temperatures up to 193°F (89°C).[39]

In 2005, after a drill hit an uncommonly-observed type of magma, researchers and PGV expressed a desire to turn the borehole into an observatory for scientific studies.[13]

References

  1. ^ a b "Lava speeds up, forcing evacuations and covering well at Puna Geothermal plant". Star Advertiser. 27 May 2018.
  2. ^ "Renewable Energy & Storage Projects". www.hawaiianelectric.com.
  3. ^ "Puna Geothermal Venture (PGV)". www.hawaiianelectric.com.
  4. ^ "Puna Geothermal Venture - Hawai'i Groundwater & Geothermal Resources Center". www.higp.hawaii.edu.
  5. ^ a b c d e Schroeder, Martin (May 27, 2016). "A Renewable Energy Solution on Hawaii Island – The Puna Geothermal Plant" (PDF). Ormat Technologies. Retrieved 30 May 2018.
  6. ^ a b c d e f g h i Szvetecz, Annie (August 2001). Geothermal energy in Hawai'i: an analysis of promotion and regulation (PDF) (MSc thesis). ProQuest LLC. Retrieved 30 May 2018.
  7. ^ a b c Boyd, Tonya L.; Thomas, D.; Gill, A. T. (September 2002). "Hawaii and Geothermal-What Has Been Happening" (PDF). Geo-Heat Center Quarterly Bulletin. 23 (3): 11–21. Retrieved 14 June 2018.
  8. ^ a b Hunt, Tam (March 20, 2015). "Is Going Bigger on Geothermal a Good Move for the Big Island?". Greentech Media. Retrieved 30 May 2018.
  9. ^ "At Puna Geothermal Venture, Success Is Always Just Around the Corner". www.environment-hawaii.org.
  10. ^ Essoyan, Susan (June 15, 1991). "Blowout Shuts Geothermal Unit in Hawaii". Los Angeles Times. Retrieved 9 June 2018.
  11. ^ Staff, Web (12 January 2016). "EPA finds Puna Geothermal Venture violated chemical safety rules". KHON2. Nexstar Media Group.
  12. ^ Higuchi, Dean (January 12, 2016). "EPA finds Puna Geothermal Venture violated chemical safety rules" (Press release). Honolulu: EPA. Retrieved 30 May 2018.
  13. ^ a b c Dalton, Rex (17 December 2008). "Drillers hit Hawaiian magma". Nature. doi:10.1038/news.2008.1317. Retrieved 2 June 2018.
  14. ^ "Abstract: Dacite Melt at the Puna Geothermal Venture Wellfield, Big Island of Hawaii". American Geophysical Union. Retrieved 2 June 2018.
  15. ^ "Abstract:Dacite Melt at the Puna Geothermal Venture Wellfield, Big Island of Hawaii". ResearchGate. Retrieved 2 June 2018.
  16. ^ a b Amos, Jonathan (17 December 2008). "Drillers break into magma chamber". BBC News. Retrieved 2 June 2018.
  17. ^ Cocke, Sophie (February 24, 2015). "Ormat Awarded Big Island Geothermal Contract". Honolulu City Beat. Retrieved 30 May 2018.
  18. ^ Kim, Alice (March 17, 2018). "Puna Geothermal Venture Increasing Production". Hawai'i Groundwater & Geothermal Resources Center. Retrieved 30 May 2018.
  19. ^ "VIDEO: Puna Geothermal Concerns At Eruption Meeting". Big Island Video News. May 5, 2018. Retrieved 30 May 2018.
  20. ^ "Crews remove pentane gas from Puna geothermal plant amid safety concerns". Hawaii News Now. May 8, 2018. Retrieved 30 May 2018.
  21. ^ "Wells are hurriedly plugged at Hawaii power plant under threat of lava flow". Los Angeles Times. AP. May 23, 2018. Retrieved 30 May 2018.
  22. ^ Burnett, John (May 21, 2018). "Official: As lava approaches, workers close to capping geothermal wells". Hawaii Tribune Herald. Retrieved 30 May 2018.
  23. ^ a b "Puna Geothermal Venture deemed stable after lava covers two wells". KHON. May 28, 2018. Retrieved 30 May 2018.
  24. ^ "State says well field at Puna Geothermal 'essentially safe'". Hawaii News Now. May 21, 2018. Retrieved 30 May 2018.
  25. ^ "VIDEO: As Lava Nears, Officials Working To Kill Geothermal Wells". Big Island Video News. May 21, 2018. Retrieved 30 May 2018.
  26. ^ a b Tom Travis (21 May 2018). As Lava Nears, Officials Working To Kill Geothermal Wells (May 21, 2018) (Press conference recording). Big Island Video News. Retrieved 21 May 2018.
  27. ^ Lincoln, Mileka. "Lava covers at least 1 well at Puna geothermal plant; governor says risk is 'mitigated'". Hawaii News Now.
  28. ^ "Some Leilani Estates residents ordered to evacuate immediately". Hawaii Tribune-Herald.
  29. ^ Rosa, Jolyn. "Lava covers potentially explosive well at Hawaii geothermal plant". Reuters. Retrieved 2018-05-28.
  30. ^ Burnett, John (May 28, 2018). "Lava takes 10 homes, covers another geothermal well". Hawaii Tribune-Herald. Retrieved May 29, 2018.
  31. ^ http://www.staradvertiser.com/2018/06/01/breaking-news/lava-burns-2-buildings-at-puna-geothermal-plant/
  32. ^ Proctor, Darrell (May 23, 2018). "Officials Say No Risk of Blackout From Lava Breach at Hawaii Geothermal Plant". Power Magazine. {{cite news}}: |access-date= requires |url= (help)
  33. ^ "Hawaii Electric Light expects sufficient power even with geothermal plant shut do" (Press release). Hawaii Electric Light. 2018-05-03. Retrieved 2018-05-30.
  34. ^ a b "Geothermal Technologies Program: Tapping the Earth's energy to meet our heat and power needs" (PDF). U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy. April 2004. Retrieved 2 June 2018.
  35. ^ a b Fitch, David; Matlick, Skip (2008). "Gold, silver and Other Metals in scale— Puna Geothermal Venture, Hawaii" (PDF). GRC Transactions. 32: 385–388. Retrieved 2 June 2018.
  36. ^ "Puna Geothermal Venture". Hamilton Library, University of Hawai'i at Manoa.
  37. ^ a b c "2017 Annual report" (PDF). Ormat Technologies.
  38. ^ "Noncovered Source Permit Review Summary (Renewal)" (PDF). health.hawaii.gov.
  39. ^ a b c Gill, Andrea T. (2004). "Prospective Direct Use Enterprises in Kapoho, Hawaii" (PDF). Hawaii Dept. of Business, Economic Development and Tourism, Strategic Industries Division. Retrieved 2 June 2018.