Talk:Saint Marys Falls Hydropower Plant: Difference between revisions
Appearance
Content deleted Content added
m Maintain {{WPBS}} and vital articles: 2 WikiProject templates. Create {{WPBS}}. Keep majority rating "Start" in {{WPBS}}. Remove 2 same ratings as {{WPBS}} in {{WikiProject Michigan}}, {{WP Energy}}. Tag: |
→Capacity: new section |
||
Line 3: | Line 3: | ||
{{WikiProject Energy|importance=low}} |
{{WikiProject Energy|importance=low}} |
||
}} |
}} |
||
== Capacity == |
|||
:"Although the hydroelectric plant could generate as much as 25-30 megawatts if operating at full capacity, grid planners rate it at 18 MW." |
|||
So, the infobox listed the installed capacity/nameplate capacity at 18 MW. Isn't that what it "could" generate at peak performance? Where is the 25-30 MW number coming from? This needs to be properly sourced. [[User:Criticalthinker|Criticalthinker]] ([[User talk:Criticalthinker|talk]]) 08:59, 21 May 2024 (UTC) |
Latest revision as of 08:59, 21 May 2024
![]() | This article is rated Start-class on Wikipedia's content assessment scale. It is of interest to the following WikiProjects: | ||||||||||||||||||||
|
Capacity[edit]
- "Although the hydroelectric plant could generate as much as 25-30 megawatts if operating at full capacity, grid planners rate it at 18 MW."
So, the infobox listed the installed capacity/nameplate capacity at 18 MW. Isn't that what it "could" generate at peak performance? Where is the 25-30 MW number coming from? This needs to be properly sourced. Criticalthinker (talk) 08:59, 21 May 2024 (UTC)