Jump to content

Protector-class offshore patrol vessel: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
modern corvettes
fix helicopter link
Line 71: Line 71:
|Ship armour=
|Ship armour=
|Ship armor=
|Ship armor=
|Ship aircraft=1 x [[SH-2 Seasprite|SH-2G Seasprite]] helicopter. Can be armed with a combination of homing torpedoes, depth charges, Maverick Air to Surface missiles, M60 Machine Gun. 1 x A109 light utility helicopter (alternative to Seasprite)
|Ship aircraft=1 x [[Kaman SH-2G Super Seasprite]] helicopter. Can be armed with a combination of homing torpedoes, depth charges, Maverick Air to Surface missiles, M60 Machine Gun. 1 x A109 light utility helicopter (alternative to Seasprite)
|Ship aircraft facilities=Hangar for Seasprite or A109
|Ship aircraft facilities=Hangar for Seasprite or A109
|Ship notes=
|Ship notes=

Revision as of 06:58, 1 February 2011

HMNZS Wellington in September 2010
HMNZS Wellington in September 2010
Class overview
NameProtector class
BuildersTenix, Williamstown
Operators Royal New Zealand Navy
Preceded byN/A
Succeeded byN/A
In commission2010
Completed2
Active2
General characteristics
TypeOffshore patrol vessel
Displacement1,900 tonnes
Length85 metres
Beam14 metres
Draft3.6 metres
PropulsionTwo MAN B&W 12RK280 diesel engines with a continuous rating of 5,400 kW at 1,000 rpm

450 kW bow thruster

Three MAN diesel electricity generators
Speedlist error: <br /> list (help)
Baseline speed 22 knots (41 km/h)

Economical speed 12 knots (22 km/h)

Loiter speed 4-10 knots (7-19 km/h)
Range6,000 nm (11,000 km)
Boats & landing
craft carried
list error: <br /> list (help)
2 x RHIB (7.74m)

6 x 45 man inflatable rafts

2x special forces RHIB (11m)
Capacity30 passengers, 3 x 20 ft sea container, 1 x 16 tonne @ 9 metres crane aft
Complement35 + 10 flight personnel + 4 personnel from Government agencies
Sensors and
processing systems
Fire Control: Optical
Armamentlist error: <br /> list (help)
1 x Remote Controlled MSI DS25 Stabilized Naval Gun with 25 mm M242 Bushmaster cannon
2 x M2HB QCB .50 calibre Browning machine guns
Small arms
Aircraft carried1 x Kaman SH-2G Super Seasprite helicopter. Can be armed with a combination of homing torpedoes, depth charges, Maverick Air to Surface missiles, M60 Machine Gun. 1 x A109 light utility helicopter (alternative to Seasprite)
Aviation facilitiesHangar for Seasprite or A109

The Protector-class offshore patrol vessel is a class of two offshore patrol vessel (OPVs) operated by the Royal New Zealand Navy (RNZN) since 2010. The ships are named HMNZS Otago and HMNZS Wellington. While these vessels have been classified as "offshore patrol boats", they could equally have been classified as modern corvettes

Key dates

The Ministry of Defence issued invitations to register (ITR) in July 2002 and signed a contract with Tenix Defence (Later BAE Systems) in July 2004. The first steel was cut in February 2005 and the first OPV HMNZS Otago was launched on 18 November 2006.

The original planned delivery date for HMNZS Otago was April 2007, this was then revised to early 2008. HMNZS Wellington was launched on 27 October 2007 with an original delivery date of May / June 2008.

While the ships are capable of carrying the SH-2G Seasprite on 30 October 2007 the NZDF announced the acquisition by NZDF of A109 light utility helicopter for training and deployment on RNZN ships including OPVs.

In September 2008 the Minister of Defence announceed delays in delivery of the two OPVs due to questions regarding the ships' seaboats and Lloyds Certification. He says the issue is under negotiation with BAE (ex-Tenix). In May 2009, mediation between the Ministry of Defence and BAE Systems commenced, with the main issue being the estimated 300 tonnes increase in weight which could cause potential hazard when OPVs are in ice in Antarctica as the weight increased over the life of the vessels.

On the 18 February 2010 Otago was accepted into the Royal New Zealand Navy.[1] NZ Ministry of Defence claims overweight issue not as bad as previously thought, but "weight will have to be carefully monitored during the ship's life". Should arrive at Devonport (Auckland) Naval Base 26 March 2010. Wellington is expected to be accepted in April 2010 and arrive at Devonport later that month. HMNZS Otago arrived at Devonport Naval Base after further delay in Australia due to engine problems, now fixed under warranty.

Design origin

Conceived as part of Project Protector, the Ministry of Defence project consisted of acquiring one multi-role vessel, two offshore and four inshore patrol vessels. The Project Protector vessels will be operated by the RNZN to conduct tasks for and with the New Zealand Customs Service, the Department of Conservation, Ministry of Foreign Affairs and Trade, Ministry of Fisheries, Maritime New Zealand, and New Zealand Police.

The vessels were designed by STX Canada Marine (formerly Kvaerner Masa Marine) and are based on earlier OPV designs in service with the Irish Naval Service (since 1999) and the Mauritian Coast Guard (since 1996). The vessel is compliant with all of the operational requirements for patrol and response, cargo carriage and handling, sea keeping for sea boat and helicopter operations, and has a high level of comfort for crew and client agency officials.

Names

On 31 March 2006 the Hon. Phil Goff, Minister of Defence, announced that the OPVs will be named HMNZS Otago and HMNZS Wellington. Otago and Wellington are the names of frigates previously operated by the RNZN. These ships will carry the honour board of their predecessors, and the heritage so represented.

An NZDF media release on 31 March 2006 gave pennant numbers for Otago (P148) and Wellington (P55).

Characteristics

EEZ patrol and response

  • Sea boat deployment and recovery in sea state 4 (seas moderate, waves 1.25 - 2.5m)
  • Helicopter launch and recovery in sea state 5 (seas rough, waves 2.5 - 4m)
  • Vertrep in sea state 6 (seas very rough, waves 4 - 6m)
  • Ability to patrol in sea state 6 and survive in sea state 9 (seas phenomenal, waves over 14m)

Ice strengthening

  • Strengthened to provide Lloyds ice class 1C protection (thin or broken first year ice to a maximum depth of 0.4m).
  • Involved strengthening the bow section, ice belt region, fin stabilisers, propulsion shaftline and the propellers.
  • Allegations in May 2009 that ice strengthening has added too much extra weight to planned displacement (up now to 1900 tonnes) so the OPV will be at risk in Antarctica because ice belt strengthening is lower than planned, leaving plates above vulnerable to pounding by blocks of ice, and also not have the capability to add future weight by installing extra equipment. OK for Southern Ocean patrols now, but it is expected that future weight increases "will have to be carefully monitored".

See also

References

  1. ^ "Navy takes delivery of first OPV". Parliament of New Zealand. 18 February 2010. Retrieved 25 February 2010.