USS Delaware (SSN-791): Difference between revisions
Appearance
Content deleted Content added
m Robot - Moving category United States Navy proposed ships to Category:Proposed ships of the United States Navy per CFD at Wikipedia:Categories for discussion/Log/2011 November 24. |
This will be a Newport News delivered boat, not Electric Boat, though both yards will build pieces just like all others in the class |
||
Line 10: | Line 10: | ||
|Ship namesake= |
|Ship namesake= |
||
|Ship awarded=December 22, 2008 |
|Ship awarded=December 22, 2008 |
||
|Ship builder=[[ |
|Ship builder=[[Newport News Shipbuilding]] |
||
|Ship original cost= |
|Ship original cost= |
||
|Ship laid down= |
|Ship laid down= |
||
Line 52: | Line 52: | ||
|} |
|} |
||
'''SSN-791''' will be a {{sclass|Virginia|submarine}}. The contract to build her was awarded to [[Electric Boat]] division of [[General Dynamics]] in [[ |
'''SSN-791''' will be a {{sclass|Virginia|submarine}}. The contract to build her was awarded to [[Huntington Ingalls Industries]] in partnership with the [[Electric Boat]] division of [[General Dynamics]] in [[Newport News, Virginia]] on December 22, 2008. This ship is the eighth and final ship of the Block III subs which will feature a revised bow, including some technology from {{sclass|Ohio|submarine|0}} SSGNs.<ref name="RevisedBow">{{cite web | title = Virginia Block III: The Revised Bow | url=http://www.defenseindustrydaily.com/virginia-block-iii-the-revised-bow-04159/ | accessdate = 2008-05-20 }}</ref> |
||
<!-- and |
<!-- and |
Revision as of 13:55, 27 April 2012
An artist's rendering of a Virginia-class submarine underway.
| |
History | |
---|---|
Awarded | December 22, 2008 |
Builder | Newport News Shipbuilding |
Status | Ordered |
General characteristics | |
Class and type | Virginia-class submarine |
Displacement | 7800 tons light, 7800 tons full |
Length | 114.9 meters (377 feet) |
Beam | 10.3 meters (34 feet) |
Propulsion | S9G reactor |
Speed | 25 knots (46 km/h)[1] |
Range | Essentially unlimited distance; 33 years |
Test depth | greater than 800 feet (250 meters)[2] |
Complement | 134 officers and men[1] |
SSN-791 will be a Virginia-class submarine. The contract to build her was awarded to Huntington Ingalls Industries in partnership with the Electric Boat division of General Dynamics in Newport News, Virginia on December 22, 2008. This ship is the eighth and final ship of the Block III subs which will feature a revised bow, including some technology from Ohio-class SSGNs.[3]
References
- ^ GlobalSecurity.org
- ^ "Virginia Block III: The Revised Bow". Retrieved 2008-05-20.
- This article includes information collected from the Naval Vessel Register, which, as a U.S. government publication, is in the public domain. The entry can be found here.