Jump to content

Bell Bay aluminium smelter: Difference between revisions

Coordinates: 41°07′26″S 146°52′08″E / 41.12389°S 146.86889°E / -41.12389; 146.86889
From Wikipedia, the free encyclopedia
Content deleted Content added
GreenC bot (talk | contribs)
Rescuing 1 sources and tagging 0 as dead. #IABot (v1.4.2)
Line 4: Line 4:
|title=Rio Tinto 2006 Data Book
|title=Rio Tinto 2006 Data Book
|accessdate=2007-08-19
|accessdate=2007-08-19
| archiveurl= https://web.archive.org/web/20070927001135/http://www.riotinto.com/documents/investors_databook/RTdatabook.pdf| archivedate= 27 September 2007 <!--DASHBot-->| deadurl= no}}</ref>
|archiveurl=https://web.archive.org/web/20070927001135/http://www.riotinto.com/documents/investors_databook/RTdatabook.pdf
|archivedate=27 September 2007
|deadurl=yes
|df=
}}</ref>
It is owned and operated by Pacific Aluminium, a wholly owned subsidiary of [[Rio Tinto Alcan]].
It is owned and operated by Pacific Aluminium, a wholly owned subsidiary of [[Rio Tinto Alcan]].



Revision as of 11:58, 17 July 2017

The Bell Bay aluminium smelter is located on the Tamar River at Bell Bay, Tasmania, Australia. The smelter has a production capacity of 178,000 tonnes of aluminium per year. [1] It is owned and operated by Pacific Aluminium, a wholly owned subsidiary of Rio Tinto Alcan.

History

The Bell Bay smelter commenced production in 1955 as a joint venture between the Commonwealth and Tasmanian governments. The smelter was the first built in the Southern Hemisphere primarily to overcome difficulties importing aluminium during wartime. Bell Bay was chosen as the location because of the available hydroelectric power and deep water facilities. Rio Tinto Aluminium purchased the smelter in 1960, when production was about 12,000 tonnes per year. [2] The original potline (Line 1) used British Aluminium Söderberg technology. It was converted to use prebake anodes in 1965 and shut down in 1981.

Technology

The smelter currently comprises three potlines of Kaiser P-57 reduction cells [3][4]

Line 2 and Line 3 were built in the early 1960s. Line 4 was built in two stages in the early 1980s.

See also

References

  1. ^ "Rio Tinto 2006 Data Book" (PDF). Archived from the original (PDF) on 27 September 2007. Retrieved 2007-08-19. {{cite web}}: Unknown parameter |deadurl= ignored (|url-status= suggested) (help)
  2. ^ Peterson, Warren S. (1986). Hall-Heroult Centennial. The Metallurgical Society. ISBN 0-87339-540-9., p22
  3. ^ "Alton Tabereaux - 'Prebake Cell Technology: A Global Review', JOM, 52 (2), pp 22-28". Archived from the original on 14 August 2007. Retrieved 2007-08-19. {{cite web}}: Unknown parameter |deadurl= ignored (|url-status= suggested) (help)
  4. ^ Bearne, Geoff (2009), Current increase, power efficiency improvement and PFC reduction at RTA Bell Bay Smelter (PDF), TMS 2009, retrieved 2011-08-15

41°07′26″S 146°52′08″E / 41.12389°S 146.86889°E / -41.12389; 146.86889