Jump to content

Talk:Wyrley and Cheslyn Hay railway station

Page contents not supported in other languages.
From Wikipedia, the free encyclopedia

This is the current revision of this page, as edited by Qwerfjkl (bot) (talk | contribs) at 05:29, 1 February 2024 (Implementing WP:PIQA (Task 26)). The present address (URL) is a permanent link to this version.

(diff) ← Previous revision | Latest revision (diff) | Newer revision → (diff)

Environs

[edit]

There are several sentences concerned with the area around the station. These veer from highly relevant (nearby foundry being a source of trade) to the trivial (etymology of the name of the district, main roads built after the station closed). I'm not sure how to refine this sensibly. --Redrose64 (talk) 10:14, 21 December 2011 (UTC)[reply]

Anachronism

[edit]

'The SSR was absorbed by the London and North Western Railway (LNWR) in 1967'.

This can't be correct.

(The South Staffordshire article does not mention when it was that the SSR was absorbed)

109.145.108.69 (talk) 02:49, 20 October 2016 (UTC)[reply]

Pinging User:Redrose64, as the information was added in this edit. The SSR was taken 1861, according to London and North Western Railway#Acquisitions, though there's no citation. Optimist on the run (talk) 06:35, 20 October 2016 (UTC)[reply]
Awdry says leased 1861, absorbed 1867. Must be my typo 9 for 8. --Redrose64 (talk) 10:16, 20 October 2016 (UTC)[reply]