Jump to content

Talk:S2G reactor

Page contents not supported in other languages.
From Wikipedia, the free encyclopedia

This is the current revision of this page, as edited by Cewbot (talk | contribs) at 08:01, 25 February 2024 (Maintain {{WPBS}}: 3 WikiProject templates. Keep majority rating "Start" in {{WPBS}}. Remove 2 same ratings as {{WPBS}} in {{WikiProject Ships}}, {{WikiProject Energy}}. Remove 5 deprecated parameters: b1, b2, b3, b4, b5.). The present address (URL) is a permanent link to this version.

(diff) ← Previous revision | Latest revision (diff) | Newer revision → (diff)

Inherent problems?[edit]

Current article reads Due to inherent problems with the concept, the Seawolf was later converted with a S2Wa Nautilus-type pressurized water reactor. That's consistent with what the S1G reactor article says, but not what the article on USS Seawolf (SSN-575) says: ADM Rickover had planned all along to standardize submarine reactor power plants. My understanding has always been that both concepts appeared sound, but Rickover chose the PWR. Andrewa 09:59, 11 June 2007 (UTC)[reply]