Ontario Highway 409
Belfield Expressway | ||||
![]() | ||||
Route information | ||||
Maintained by Ministry of Transportation of Ontario | ||||
Length | 6.5 km[1] (4.0 mi) | |||
Existed | 1972[citation needed]–present | |||
Major junctions | ||||
West end | Pearson Airport | |||
East end | ![]() | |||
Location | ||||
Country | Canada | |||
Highway system | ||||
| ||||
|
![](http://upload.wikimedia.org/wikipedia/commons/thumb/e/ea/Belfieldexpressway.jpg/250px-Belfieldexpressway.jpg)
Highway 409 is an Ontario provincial 400 series expressway that extends from the Highway 401 in Toronto to Toronto Pearson International Airport, west of Highway 427, in Mississauga. It is a short freeway used mainly as a bypass for traffic approaching the airport or Highway 427 (northbound) from Highway 401 (westbound), since both are not accessible at the mega-interchange between Highways 401 and 427. It is known as the Belfield Expressway for its entire length.
The portion of Highway 409 west of Highway 427 is owned and operated by the Greater Toronto Airports Authority, though it is still signed as Highway 409 going eastbound.
Both the Ontario Provincial Police (east of Highway 427 to Highway 401) and Peel Regional Police (west of Highway 427) patrol the highway.
Volume Information (2005)
- Highest Volume: 98,400 AADT from Kipling Avenue to Highway 401
- Lowest Volume: 58,500 AADT from Airport Road to Highway 427
Exit list
Location | Destinations | Notes |
---|---|---|
Mississauga | Toronto Pearson International Airport | Westbound exit and eastbound entrance. No access to Viscount Road from Terminal 1 arrivals level or Terminal 3. |
![]() |
No eastbound exit. No access to Terminal 1 from westbound entrance. No access to Viscount Road, Network Road from eastbound entrance. | |
Viscount Road | No westbound entrance. No access to Network Road. | |
Network Road | Eastbound exit and westbound entrance. No access to Viscount Road, Airport Road. | |
![]() ![]() |
No westbound entrance from northbound 427. | |
Toronto | ||
Attwell Drive | Eastbound exit and westbound entrance | |
Martin Grove Road | ||
Belfield Road, Kipling Avenue | Westbound exit and eastbound entrance | |
Collectors - Weston Road, Black Creek Drive | Eastbound exit and westbound entrance | |
![]() |
Eastbound exit and westbound entrance |
Emergency construction
On July 8, 2009 the concrete on highway 409 westbound was replaced during an emergency closure. It was not planned but the concrete began to break up and posed a hazard for drivers on the 409. The construction was completed on July 9 at approximately 7:41 am EDT.[citation needed]