Intrepid Wind Farm

Coordinates: 42°33′12″N 95°19′16″W / 42.5533°N 95.3211°W / 42.5533; -95.3211
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by 74.38.77.101 (talk) at 06:17, 20 October 2015. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Intrepid Wind Farm
Map
CountryUnited States
LocationSac and Buena Vista countries in Iowa
Coordinates42°33′12″N 95°19′16″W / 42.5533°N 95.3211°W / 42.5533; -95.3211
StatusOperational
Owner(s)MidAmerican Energy Company
Operator(s)MidAmerican Energy Company
Wind farm
Type
Power generation
Units operational107
Nameplate capacity160.5 MW

The Intrepid Wind Farm consists of 107 wind turbines, located in Sac and Buena Vista counties in north-west Iowa, has a generating capacity of 160.5 megawatts of electricity. The wind power project is MidAmerican Energy Company’s first owned and operated wind generation facility and became operational on December 31, 2004.[1]

When MidAmerican Energy first began planning the Intrepid site, the company worked closely with several state and national environmental groups, with a view to minimizing the environmental impact. Using input from such diverse groups as the Iowa Department of Natural Resources, the Nature Conservancy, Iowa State University, the U.S. Fish and Wildlife Service, the Iowa Natural Heritage Foundation, and the Iowa Chapter of the Sierra Club, MidAmerican created a statewide map of areas in the proposed region that contained specific bird populations or habitats. Those areas were then avoided when detailed site planning occurred. MidAmerican also worked in conjunction with the Army Corp of Engineers, to secure all necessary permits related to any potential risk to wetlands in the area. Regular inspections are also conducted to make certain that the wind farm is causing no adverse environmental impact to the region.[2]