IndustryElectricity generation
Founded1995
Defunct2009, continued as subsidiary until 30 June 2011
FateAcquired by Électricité de France, delisted 3 February 2009
SuccessorEDF Energy
HeadquartersLondon, UK
Productselectrical power
Revenue£2,999m (2007)
£794m (2007)
£465m (2007)

British Energy was the UK's largest electricity generation company by volume, before being taken over by Électricité de France (EDF) in 2009.[1] British Energy operated eight former UK state-owned nuclear power stations and one coal-fired power station.

From 1 July 2010 the rebranding of British Energy locations and communications to EDF Energy commenced as part of its incorporation into the parent group, following around 17 months of dual branding. This was concluded with the renaming of the operating company from British Energy Generation Limited to EDF Energy Nuclear Generation Limited on 1 July 2011.[2]

Structure

In 2009, the British Energy subsidiary group was structured accordingly:[3]

  • British Energy Group plc: holding company, a wholly owned subsidiary of EDF S.A.
    • British Energy Generation Ltd: dominant subsidiary; owned and ran the large power stations, was licensed to operate nuclear power stations.
    • District Energy Ltd: owned four modern 10 MWe natural gas fuelled power plants.
    • British Energy Renewables Ltd: participated in a small number of renewable power projects.
    • Lewis Wind Power Ltd: joint venture with AMEC to develop a proposed wind farm on the Isle of Lewis.[4]

History

Early history and development

British Energy was established and registered in Scotland in 1995 to operate the eight most modern nuclear power plants in the UK. It took the two AGR plants from Scottish Nuclear and five AGR and a sole PWR plant from Nuclear Electric.[5][6] The residual Magnox power stations from these two companies were transferred to Magnox Electric which later became the generation division of British Nuclear Fuels. The company was privatised in 1996.[7]

It retained major technical offices at Barnwood, formerly the HQ of Nuclear Electric, and Peel Park, formerly the HQ of Scottish Nuclear.

In June 1999, in an attempt to become an integrated generating and retail company, British Energy bought the retail electricity and gas supplier SWALEC based in Wales, providing 6% of the England and Wales electricity supply market. However it was unable to purchase another retailer at a reasonable cost to create a widespread retail presence, so sold SWALEC a few months later to Scottish and Southern Energy.[8]

British Energy bought the 2,000 MWe Eggborough coal fired station from National Power in 2000 to provide a more flexible power production facility and reduce penalty charge risks from the New Electricity Trading Arrangements introduced in March 2001. Despite this, the new arrangements led to a significantly lower electricity price for inflexible base load power stations such as British Energy had. The purchase of Eggborough occurred at the peak of the market for power stations, and in 2002 the value of the station was written down by half.[9]

In 2001, the company was the major partner in taking on an operating lease to become the operator of Bruce Nuclear Generating Station in Ontario, Canada. The resultant subsidiary was called Bruce Power. As part of financial re-structuring, Bruce Power was sold to a consortium of Canadian investors in February 2003.[10]

Dungeness B advanced gas-cooled reactor, in 2005 given a 10-year life extension to 2018.

In 2007 British Energy entered into a 7-year partnership agreement with Doosan Babcock Energy to provide technical, engineering and operational support across all British Energy sites. The agreement was at the time held to be potentially worth around £550 million, bringing up to 800 jobs into Scotland and the rest of the UK.[11]

Financial difficulties

The company faced financial trouble from 2002, when it first approached the British government for financial aid. This followed a slump in wholesale energy prices, a failure to obtain relaxations on the Climate Change Levy, and renegotiations of its back-end fuel costs with BNFL,[12] as well as issues with a number of its reactors (resulting in much capacity being offline during critical periods of the company financial crisis) and a failure to complete a timely sale of its joint-venture share in AmerGen. Parties to the resulting talks included bondholders, significant but unsecured creditors, power purchase agreement counterparties, and a group of secured creditors known as the Eggborough banks; who had provided financing for the purchase of the Eggborough coal-fired power plant in 2000.

The plan that resulted from these talks nearly eliminated any equity interest of existing stockholders; the firm's creditors waived over £1bn of debts in return for control of the company. Shareholders received only 2.5% of the shares of the new company.

On 22 September 2004 the UK government's investment of over £3 billion in the restructured firm was approved by the European Commission. On 24 September the company was reclassified as a public body in what the Office for National Statistics described as a reflection of "the control that can be exercised by government over British Energy". This move was described by The Times as a de facto nationalisation of the group.

Restructuring

Under the British Government's restructuring programme the Nuclear Liabilities Fund (NLF) acted as a creditor and liability receiver for British Energy Group. In return, a mechanism was put in place whereby NLF could carry out a cash sweep of the organisation and claim 65% of British Energy's available cash flow each year, on top of a fixed annual contribution. British Energy was allowed to borrow up to £700m under the arrangements, with the NLF providing £275m.

The British Government also assumed British Energy nuclear fuel liabilities worth between £150m and £200m p.a. over ten years.[13] These fuel liabilities extended until 2086.

Despite its financial problems and government help with its fuel liabilities, British Energy's Chief Executive claimed, on 20 June 2006, that nuclear power stations would be economically viable without government guarantee or subsidy if the operation of the energy market was changed.[14][citation needed]

The British Government's interest in British Energy at this time was managed by the Shareholder Executive on behalf of the Department of Trade and Industry (DTI).

The restructuring of British Energy was subject to three National Audit Office reports; in May 1998, February 2004 and March 2006.

In 2007 the House of Commons Public Accounts Committee reported on the restructuring.[15] They noted that the taxpayer had been left to underwrite large liabilities, revalued at £5.3 billion, while creditors who would have received little on liquidation received bonds and shares worth £3.9 billion in 2006.

Disposal of government interest

In July 2006 the government announced that they were considering selling part of their interest in British Energy.[16] On 30 May 2007 it was announced that the Secretary of State for Trade and Industry would instruct the Nuclear Liabilities Fund to sell up to approximately 450 million shares, representing around 28% of the Fund's interest in British Energy.[16][17] The Fund's cash sweep percentage would be reduced from around 64% to approximately 36% following the sale.[17] Revenue from the sale was used to diversify the Nuclear Liabilities Fund's assets.

Acquisition by EDF

On 24 September 2008, it was announced that Électricité de France (EDF), the state owned French energy company, had agreed a takeover of the company, paying £12.5 billion.[18] Centrica purchased a 20% share of British Energy from EDF in August 2009.[19]

On 1 April 2010, EDF transferred the coal-fired Eggborough Power Station to the plant's bondholders as per an earlier agreement, and in compliance with commitments made to the European Commission when agreeing the acquisition of British Energy.[20]

Operations

At the time of the EDF acquisition, British Energy operated the following power stations:

Power Station Type Net MWe Construction started Connected to grid Full operation Accounting closure date
Dungeness B AGR 1110 1965 1983 1985 2018
Eggborough coal 1960 1960 1967 1970
Hartlepool AGR 1210 1968 1983 1989 2019
Heysham 1 AGR 1150 1970 1983 1989 2019
Heysham 2 AGR 1250 1980 1988 1989 2023
Hinkley Point B AGR 1220 1967 1976 1976 2023
Hunterston B AGR 1190 1967 1976 1976 2023
Sizewell B PWR 1188 1988 1995 1995 2035
Torness AGR 1250 1980 1988 1988 2023

In 2005 British Energy announced a 10-year life extension at Dungeness B, that would see the station continue operating until 2018,[21] and in 2007 announced a 5-year life extension of Hinkley Point B and Hunterston B until 2016.[22]

Following an outage in 2006 when an increase in creep-induced defect in boiler tubes was observed, Hinkley Point B and Hunterston B were restricted to about 70% of normal output from 2007 and operated at reduced boiler outlet temperatures. After recovery, operation at 80% of the nominal output was allowed.[22]

It was announced in December 2009 that new stations would be built at existing land owned around Sizewell and Hinkley Point stations. Dungeness was considered but was thought to be a poor choice for a new build.[23]

See also

References

  1. ^ "EDF agrees to pay $23 billion for British Energy". The New York Times. 24 September 2008. Retrieved 11 July 2012.
  2. ^ "The sale of the Government's interest in British Energy". Retrieved 11 July 2012.
  3. ^ "British Energy structure". British Energy. Retrieved 14 July 2010.
  4. ^ "Lewis Wind Farm, United Kingdom". power-technology.com. Retrieved 14 July 2010.[unreliable source?]
  5. ^ The CEGB Story Archived 9 December 2012 at archive.today by Rob Cochrane (with additional research by Maryanna Schaefer) (1990)
  6. ^ Page 68 – "Lessons from Liberalised Electricity Markets" Archived 17 May 2014 at the Wayback Machine IEA / OECD (2005)
  7. ^ Chronology: British Energy in bid talks
  8. ^ "Risk Management: The Nuclear Liabilities of British Energy plc" (Document). National Audit Office. 6 February 2004. p. 28. {{cite document}}: Unknown parameter |access-date= ignored (help); Unknown parameter |archive-date= ignored (help); Unknown parameter |archive-url= ignored (help); Unknown parameter |url-status= ignored (help); Unknown parameter |url= ignored (help)
  9. ^ "Risk Management: The Nuclear Liabilities of British Energy plc" (Document). National Audit Office. 6 February 2004. p. 24. {{cite document}}: Unknown parameter |access-date= ignored (help); Unknown parameter |archive-date= ignored (help); Unknown parameter |archive-url= ignored (help); Unknown parameter |url-status= ignored (help); Unknown parameter |url= ignored (help)
  10. ^ British Energy considers asset sale
  11. ^ British Energy signs partnership[permanent dead link]
  12. ^ "Funding Universe – History of BNFL". Retrieved 11 July 2012.
  13. ^ Taxpayers' £184m aid to private energy firm
  14. ^ Times on line(subscription required)
  15. ^ The Restructuring of British Energy, 19 July 2007, House of Commons Public Accounts Committee
  16. ^ a b Government disposal of interest in British Energy Group plc Archived 30 September 2007 at the Wayback Machine, Government News Network, published 2007-05-30, accessed 6 June 2007
  17. ^ a b Impact of Government Announcement re Disposal of Interest in British Energy Archived 28 September 2007 at the Wayback Machine, British Energy, published 2007-05-31, accessed 6 June 2007
  18. ^ "EDF agrees to buy British Energy". BBC News. 24 September 2008. Retrieved 2 January 2010.
  19. ^ "Approval from the OFT of Centrica's acquisition of 20% of British Energy from EDF". Centrica. Archived from the original on 2 October 2011.
  20. ^ Catherine Airlie (1 April 2010). "EDF Transfers Eggborough Plant to Bondholders After Buying British Energy". Bloomberg. Retrieved 7 July 2010.
  21. ^ "10-year life extension at Dungeness B nuclear power station" (Document). British Energy. 15 September 2005. {{cite document}}: Unknown parameter |access-date= ignored (help); Unknown parameter |archive-date= ignored (help); Unknown parameter |archive-url= ignored (help); Unknown parameter |url-status= ignored (help); Unknown parameter |url= ignored (help)
  22. ^ a b "The United Kingdom's Fifth National Report on Compliance with the Convention on Nuclear Safety Obligations" (Document). London: Department of Energy & Climate Change. October 2010. p. 22. {{cite document}}: Unknown parameter |url= ignored (help)
  23. ^ "Press Release – Miliband sets strategic direction for overhaul of energy system". Department of Energy and Climate Change. 9 November 2009. Archived from the original on 19 November 2009.